X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545180810002

Well Details

Well ID: 0545180810002
Loading map...
Location: 00/10-08-054-18W5/2
Location Alias: 00/10-08-54-18 W5M
Location Alias 2: 00/10-08-054-18 W5/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 18
Section: 08
County/Municipality: Yellowhead County
Well Name: SALVO ENERGY EDSON 10-8-54-18
Operator Name: Long Run Exploration Ltd.
License Number: 0022627
License Date: 1962-06-20
License Status: Issued
Spud Date: 1962-06-20
Final Drill Date: 1962-08-01
Well Total Depth: 2857.50 m
Surface Hole Latitude: 53.651973
Surface Hole Longitude: -116.614302

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-06-20 Obtained License
1962-08-01 Finished Drilling
1962-08-01 Well Mode changed to Drilled and Cased
1962-08-02 Drill Stem Test Performed
1962-08-05 Drill Stem Test Performed
1962-08-07 Drill Stem Test Performed
1962-08-08 Drill Stem Test Performed
1962-08-12 Drill Stem Test Performed
1962-08-13 Drill Stem Test Performed
1962-08-16 Drill Stem Test Performed
1962-08-17 Drill Stem Test Performed
1962-08-19 Production Casing Operation Performed
1962-08-22 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-23 Perforation Treatment Performed - Jet Perforation
1962-09-03 Perforation Treatment Performed - Acid Wash - No Pressure
1962-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-09-03 Perforation Treatment Performed - Bullet Perforation
1963-03-18 Perforation Treatment Performed - Fractured
1978-02-22 Perforation Treatment Performed - Cement Squeeze
1978-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-02-28 Perforation Treatment Performed - Jet Perforation
1978-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-04 Perforation Treatment Performed - Cement Squeeze
1978-03-04 Perforation Treatment Performed - Jet Perforation
1978-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-05 Perforation Treatment Performed - Jet Perforation
1978-03-07 Perforation Treatment Performed - Jet Perforation
1978-03-24 Perforation Treatment Performed - Fractured
1978-04-08 Well Began Production
1978-04-08 Well Fluid changed to Crude Oil
1978-04-08 Well Mode changed to Flowing
1978-04-14 Well Fluid changed to Crude Oil
1978-04-14 Well Mode changed to Suspended
1978-07-27 Well Fluid changed to Crude Oil
1978-07-27 Well Mode changed to Flowing
1999-02-18 Well Log Performed
1999-02-28 Perforation Treatment Performed - Jet Perforation
1999-02-28 Well Log Performed
1999-03-18 Perforation Treatment Performed - Fractured
2016-05-01 Well Fluid changed to Crude Oil
2016-05-01 Well Mode changed to Pumping
2019-10-31 Well Fluid changed to Crude Oil
2019-10-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-08-22 Hydra Jet Perforation 2728.60 2728.60 0
1978-02-22 Cement Squeeze 1926.30 1935.50 0
1978-02-27 Packing Device Capped w/Cement 2636.50 2636.50 0
1978-02-28 Perforation 2551.50 2551.80 13
1978-03-01 Acid Treatment 2551.50 2551.80 0
1978-03-04 Perforation 2547.80 2548.10 13
1978-03-04 Cement Squeeze 2547.80 2551.80 0
1978-03-05 Perforation 2529.80 2530.10 13
1978-03-05 Acid Treatment 2529.80 2530.10 0
1978-03-07 Perforation 2531.70 2533.20 3
1978-03-07 Perforation 2536.50 2539.30 3
1962-08-22 Acid Treatment 2728.60 2728.60 0
1978-03-07 Perforation 2545.40 2546.90 3
1978-03-24 Fracture 2531.70 2546.90 0
1999-02-28 Perforation 2533.00 2538.00 13
1999-02-28 Perforation 2542.00 2547.00 13
1999-03-18 Fracture 2531.70 2547.00 0
1962-08-23 Perforation 2716.40 2717.30 13
1962-08-23 Perforation 2720.00 2726.70 13
1962-08-23 Acid Treatment 2716.40 2728.60 0
1962-09-03 Packing Device Capped w/Cement 1981.20 1981.20 0
1962-09-03 Bullet Perforation 1926.30 1935.50 0
1962-09-03 Acid Wash 1926.30 1935.50 0
1963-03-18 Fracture 1926.30 1935.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2237 0.0 0.0 0.0
1979 2302 0.0 0.0 0.0
1980 1678 0.0 0.0 0.0
1981 2585 0.0 0.0 0.0
1982 2576 0.0 0.0 0.0
1983 2181 0.0 0.0 0.0
1984 7459 0.0 0.0 0.0
1985 8498 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8707 0.0 0.0 0.0
1988 8491 0.0 0.0 0.0
1989 5878 0.0 0.0 0.0
1990 8393 0.0 0.0 0.0
1991 8181 0.0 0.0 0.0
1992 8324 0.0 0.0 0.0
1993 8641 0.0 0.0 0.0
1994 8422 0.0 0.0 0.0
1995 8682 0.0 0.0 0.0
1996 8543 0.0 0.0 0.0
1997 8552 0.0 0.0 0.0
1998 8045 0.0 0.0 0.0
1999 7552 0.0 0.0 0.0
2000 7907 0.0 0.0 0.0
2001 8686 0.0 0.0 0.0
2002 8620 0.0 0.0 0.0
2003 8529 0.0 0.0 0.0
2004 8682 0.0 0.0 0.0
2005 8663 0.0 0.0 0.0
2006 8556 0.0 0.0 0.0
2007 8663 0.0 0.0 0.0
2008 8471 0.0 0.0 0.0
2009 8734 0.0 0.0 0.0
2010 8320 0.0 0.0 0.0
2011 8620 0.0 0.0 0.0
2012 8312 0.0 0.0 0.0
2013 8318 0.0 0.0 0.0
2014 8608 0.0 0.0 0.0
2015 8521 0.0 0.0 0.0
2016 8761 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 5327 0.0 0.0 0.0

For data sources see[5]

References