X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544251906000

Well Details

Well ID: 0544251906000
Loading map...
Location: 00/06-19-054-25W4/0
Location Alias: 00/06-19-54-25 W4M
Location Alias 2: 00/06-19-054-25 W4/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 25
Section: 19
County/Municipality: Sturgeon County
Well Name: IMPERIAL STURGEON NO. 1
Operator Name: Canadian Natural Resources Limited
License Number: 0002659
License Date: 1951-03-01
License Status: RecCertified
Spud Date: 1951-03-04
Final Drill Date: 1951-05-17
Well Total Depth: 1781.30 m
Surface Hole Latitude: 53.677938
Surface Hole Longitude: -113.679622

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-03-01 Obtained License
1951-03-20 Drill Stem Test Performed
1951-03-21 Drill Stem Test Performed
1951-03-22 Drill Stem Test Performed
1951-03-24 Drill Stem Test Performed
1951-03-26 Drill Stem Test Performed
1951-03-28 Drill Stem Test Performed
1951-04-27 Drill Stem Test Performed
1951-04-28 Drill Stem Test Performed
1951-05-12 Drill Stem Test Performed
1951-05-17 Finished Drilling
1951-05-17 Well Mode changed to Drilled and Cased
1951-05-20 Production Casing Operation Performed
1951-05-22 Perforation Treatment Performed - Jet Perforation
1951-05-25 Perforation Treatment Performed - Acid Wash - No Pressure
1951-05-25 Perforation Treatment Performed - Jet Perforation
1951-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-05-28 Perforation Treatment Performed - Cement Plug
1951-06-12 Perforation Treatment Performed - Bullet Perforation
1951-06-14 Perforation Treatment Performed - Jet Perforation
1951-06-18 Perforation Treatment Performed - Acid Wash - No Pressure
1951-06-22 Perforation Treatment Performed - Jet Perforation
1951-08-04 Well Began Production
1951-08-04 Well Fluid changed to Crude Oil
1951-08-04 Well Mode changed to Flowing
1952-06-08 Perforation Treatment Performed - Jet Perforation
1952-06-14 Perforation Treatment Performed - Jet Perforation
1952-06-16 Perforation Treatment Performed - Cement Squeeze
1952-08-16 Drill Stem Test Performed
1952-08-16 Perforation Treatment Performed - Bullet Perforation
1953-09-12 Well Fluid changed to Gas
1953-09-12 Well Mode changed to Flowing
1956-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-11-26 Well Fluid changed to Gas
1957-11-26 Well Mode changed to Suspended
1959-09-30 Well Fluid changed to Gas
1959-09-30 Well Mode changed to Flowing
1960-10-13 Well Fluid changed to Gas
1960-10-13 Well Mode changed to Suspended
1961-06-02 Well Fluid changed to Gas
1961-06-02 Well Mode changed to Flowing
1962-10-05 Well Fluid changed to Gas
1962-10-05 Well Mode changed to Suspended
1963-10-22 Perforation Treatment Performed - Cement Squeeze
1963-10-26 Perforation Treatment Performed - Cement Squeeze
1963-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-29 Perforation Treatment Performed - Jet Perforation
1963-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-30 Perforation Treatment Performed - Acid Wash - No Pressure
1963-10-30 Perforation Treatment Performed - Fractured
1965-06-11 Perforation Treatment Performed - Cement Squeeze
1965-06-12 Well Abandoned
1965-06-12 Well Fluid changed to Gas
1965-06-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-05-22 Perforation 1348.70 1350.00 13
1951-06-18 Acid Wash 1139.30 1141.80 0
1951-06-22 Perforation 1141.20 1141.80 7
1951-06-22 Perforation 1141.80 1142.40 13
1952-06-08 Perforation 1142.70 1143.30 13
1952-06-14 Perforation 1142.40 1143.30 0
1952-06-16 Cement Squeeze 1139.30 1143.30 0
1952-08-16 Bullet Perforation 1146.70 1148.20 13
1952-08-16 Bullet Perforation 1150.00 1153.10 13
1956-02-25 Acid Treatment 1146.70 1148.20 0
1956-02-25 Acid Treatment 1150.00 1153.10 0
1951-05-25 Perforation 1350.00 1351.50 13
1963-10-22 Cement Squeeze 1139.30 1153.10 0
1963-10-26 Cement Squeeze 1139.30 1142.40 0
1963-10-29 Perforation 1146.00 1147.30 13
1963-10-29 Acid Treatment 1146.00 1147.30 0
1963-10-30 Acid Wash 1146.00 1147.30 0
1963-10-30 Acid Treatment 1146.00 1147.30 0
1963-10-30 Fracture 1146.00 1147.30 0
1965-06-11 Cement Squeeze 1123.50 1149.40 0
1951-05-25 Acid Wash 1348.70 1351.50 0
1951-05-26 Acid Treatment 1348.70 1351.50 0
1951-05-27 Acid Treatment 1350.00 1351.50 0
1951-05-28 Cement Plug 1161.30 1197.30 0
1951-06-12 Bullet Perforation 1139.30 1140.60 13
1951-06-14 Perforation 1140.60 1141.80 13
1951-06-18 Acid Wash 1139.30 1141.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References