If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0544251810000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.666652,"lon":-113.673488,"icon":""}]} |
Location: 00/10-18-054-25W4/0 | |
Location Alias: 00/10-18-54-25 W4M | |
Location Alias 2: 00/10-18-054-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 4 | |
Range: 25 | |
Section: 18 | |
County/Municipality: Sturgeon County | |
Well Name: OSEC ET AL STURGEON 10-18B-54-25 | |
Operator Name: O S E C Petroleum Canada Limited | |
License Number: 0004109 | |
License Date: 1952-01-19 | |
License Status: RecCertified | |
Spud Date: 1952-01-27 | |
Final Drill Date: 1952-02-23 | |
Well Total Depth: 1173.20 m | |
Surface Hole Latitude: 53.666652 | |
Surface Hole Longitude: -113.673488 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-01-19 | Obtained License |
1952-02-09 | Drill Stem Test Performed |
1952-02-12 | Drill Stem Test Performed |
1952-02-13 | Drill Stem Test Performed |
1952-02-16 | Drill Stem Test Performed |
1952-02-17 | Drill Stem Test Performed |
1952-02-19 | Drill Stem Test Performed |
1952-02-20 | Drill Stem Test Performed |
1952-02-21 | Drill Stem Test Performed |
1952-02-22 | Drill Stem Test Performed |
1952-02-23 | Finished Drilling |
1952-02-23 | Well Mode changed to Drilled and Cased |
1952-02-27 | Drill Stem Test Performed |
1952-03-03 | Production Casing Operation Performed |
1952-03-15 | Perforation Treatment Performed - Selective Jet Perforations |
1952-06-05 | Well Began Production |
1952-06-05 | Well Fluid changed to Crude Oil |
1952-06-05 | Well Mode changed to Pumping |
1952-08-27 | Perforation Treatment Performed - Jet Perforation |
1952-08-28 | Perforation Treatment Performed - Jet Perforation |
1954-10-26 | Perforation Treatment Performed - Cement Plug |
1954-10-29 | Perforation Treatment Performed - Bullet Perforation |
1954-10-29 | Perforation Treatment Performed - Jet Perforation |
1954-10-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1954-11-19 | Well Fluid changed to Crude Oil |
1954-11-19 | Well Mode changed to Suspended |
1960-12-13 | Well Fluid changed to Gas |
1960-12-13 | Well Mode changed to Flowing |
1961-11-22 | Perforation Treatment Performed - Fractured |
1962-07-24 | Perforation Treatment Performed - Cement Plug |
1962-07-25 | Well Fluid changed to Gas |
1962-07-25 | Well Mode changed to Abandoned and Re-entered |
1984-05-24 | Well Log Performed |
1984-05-25 | Well Log Performed |
1984-05-26 | Well Log Performed |
1984-05-28 | Well Log Performed |
1984-08-02 | Well Log Performed |
1984-08-04 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-03-15 | Selective Jet Perforations | 1153.40 | 1153.40 | 0 |
1961-11-22 | Fracture | 1140.00 | 1148.20 | 0 |
1962-07-24 | Cement Plug | 1088.70 | 1149.10 | 0 |
1952-08-27 | Perforation | 1153.40 | 1154.00 | 13 |
1952-08-28 | Perforation | 1154.00 | 1154.60 | 13 |
1954-10-26 | Cement Plug | 1151.20 | 1173.20 | 0 |
1954-10-29 | Perforation | 1140.00 | 1141.20 | 13 |
1954-10-29 | Bullet Perforation | 1140.00 | 1141.20 | 7 |
1954-10-29 | Perforation | 1147.30 | 1148.20 | 13 |
1954-10-29 | Bullet Perforation | 1147.30 | 1148.20 | 7 |
1954-10-30 | Acid Treatment | 1140.00 | 1148.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]