X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544112805000

Well Details

Well ID: 0544112805000
Loading map...
Location: 00/05-28-054-11W4/0
Location Alias: 00/05-28-54-11 W4M
Location Alias 2: 00/05-28-054-11 W4/00
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 11
Section: 28
County/Municipality: County of Two Hills No. 21
Well Name: HB ET AL DUVERNAY 5-28-54-11
Operator Name: Canadian Natural Resources Limited
License Number: 0085660
License Date: 1980-09-16
License Status: RecCertified
Spud Date: 1980-09-16
Final Drill Date: 1980-09-21
Well Total Depth: 704.00 m
Surface Hole Latitude: 53.692907
Surface Hole Longitude: -111.568779

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-16 Obtained License
1980-09-21 Finished Drilling
1980-09-23 Drill Stem Test Performed
1980-09-24 Drill Stem Test Performed
1980-09-25 Production Casing Operation Performed
1980-10-16 Perforation Treatment Performed - Jet Perforation
1980-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-17 Well Mode changed to Drilled and Cased
1980-10-19 Perforation Treatment Performed - Jet Perforation
1982-02-22 Well Began Production
1982-02-22 Well Fluid changed to Gas
1982-02-22 Well Mode changed to Flowing
1983-06-12 Well Fluid changed to Gas
1983-06-12 Well Mode changed to Suspended
1983-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-01 Well Began Injection
1984-01-01 Well Fluid changed to Water
1984-01-01 Well Type changed to Disposal
1984-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-13 Well Log Performed
1984-12-14 Perforation Treatment Performed - Jet Perforation
1984-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-01 Well Fluid changed to Water
1993-11-01 Well Mode changed to Suspended
1993-11-01 Well Type changed to Disposal
1994-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-12 Perforation Treatment Performed - Jet Perforation
1994-08-12 Perforation Treatment Performed - Remedial Casing
1994-08-12 Plug Back Performed
1994-08-12 Well Fluid changed to Water
1994-08-12 Well Mode changed to Abandoned
1994-08-12 Well Type changed to Disposal
1995-11-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-16 Perforation 659.70 661.30 7
1984-12-17 Acid Treatment 648.50 654.00 0
1994-08-12 Packing Device Capped w/Cement 629.50 637.50 0
1994-08-12 Perforation 242.00 243.00 13
1994-08-12 Remedial Casing Cementing 242.00 243.00 0
1980-10-17 Packing Device Capped w/Cement 655.50 659.00 0
1980-10-19 Perforation 648.70 650.50 7
1980-10-19 Perforation 651.50 653.50 7
1983-06-14 Acid Treatment 648.70 653.50 0
1984-03-09 Acid Treatment 648.70 653.50 0
1984-05-15 Acid Treatment 648.70 653.50 0
1984-07-26 Acid Treatment 648.70 653.50 0
1984-12-14 Perforation 648.50 654.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 3113 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References