If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0544093608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.705366,"lon":-111.18669,"icon":""}]} |
Location: 00/08-36-054-09W4/0 | |
Location Alias: 00/08-36-54-09 W4M | |
Location Alias 2: 00/08-36-054-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 4 | |
Range: 09 | |
Section: 36 | |
County/Municipality: County of Two Hills No. 21 | |
Well Name: CNRL HB BEAUVALLON 8-36-54-9 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0074962 | |
License Date: 1979-03-16 | |
License Status: Abandoned | |
Spud Date: 1979-03-28 | |
Final Drill Date: 1979-03-31 | |
Well Total Depth: 640.00 m | |
Surface Hole Latitude: 53.705366 | |
Surface Hole Longitude: -111.186690 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-03-16 | Obtained License |
1979-03-31 | Finished Drilling |
1979-03-31 | Well Mode changed to Drilled and Cased |
1979-04-01 | Lost Circulation Occurred |
1979-04-03 | Production Casing Operation Performed |
1979-05-20 | Perforation Treatment Performed - Jet Perforation |
1981-10-20 | Well Began Production |
1981-10-20 | Well Fluid changed to Gas |
1981-10-20 | Well Mode changed to Flowing |
1996-01-01 | Well Fluid changed to Gas |
1996-01-01 | Well Mode changed to Suspended |
1998-12-02 | Well Log Performed |
1998-12-04 | Perforation Treatment Performed - Jet Perforation |
1998-12-04 | Well Fluid changed to Gas |
1998-12-04 | Well Log Performed |
1998-12-04 | Well Mode changed to Suspended |
2005-02-01 | Well Fluid changed to Gas |
2005-02-01 | Well Mode changed to Flowing |
2005-07-13 | Perforation Treatment Performed - Cement Plug |
2005-07-13 | Well Log Performed |
2005-07-14 | Well Log Performed |
2005-07-16 | Perforation Treatment Performed - Jet Perforation |
2005-07-16 | Well Log Performed |
2008-06-30 | Well Fluid changed to Gas |
2008-06-30 | Well Mode changed to Suspended |
2009-05-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-05-04 | Plug Back Performed |
2009-05-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-05-05 | Perforation Treatment Performed - Jet Perforation |
2009-05-05 | Plug Back Performed |
2009-05-05 | Well Fluid changed to Gas |
2009-05-05 | Well Log Performed |
2009-05-05 | Well Mode changed to Abandoned Zone |
2010-05-15 | Well Log Performed |
2010-05-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-05-19 | Perforation Treatment Performed - Jet Perforation |
2010-05-19 | Plug Back Performed |
2010-05-19 | Well Log Performed |
2010-05-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-05-21 | Perforation Treatment Performed - Remedial Casing |
2010-06-03 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-05-20 | Perforation | 471.00 | 472.00 | 7 |
2010-05-19 | Perforation | 296.00 | 299.00 | 13 |
2010-05-19 | Packing Device Capped w/Cement | 281.00 | 291.00 | 0 |
2010-05-19 | Perforation | 238.00 | 241.00 | 13 |
2010-05-21 | Remedial Casing Cementing | 238.00 | 241.00 | 0 |
2010-05-21 | Packing Device Capped w/Cement | 205.00 | 235.00 | 0 |
1998-12-04 | Perforation | 533.00 | 534.00 | 20 |
2005-07-13 | Cement Plug | 533.20 | 582.20 | 0 |
2005-07-16 | Perforation | 475.00 | 476.00 | 13 |
2009-05-04 | Packing Device Capped w/Cement | 466.00 | 530.00 | 0 |
2009-05-05 | Perforation | 432.00 | 434.00 | 17 |
2009-05-05 | Perforation | 427.50 | 428.50 | 17 |
2009-05-05 | Packing Device Capped w/Cement | 450.50 | 465.50 | 0 |
2010-05-19 | Packing Device Capped w/Cement | 414.00 | 424.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 28 | 0.0 | 0.0 | 0.0 |
1982 | 1925 | 0.0 | 0.0 | 0.0 |
1983 | 3489 | 0.0 | 0.0 | 0.0 |
1984 | 3084 | 0.0 | 0.0 | 0.0 |
1985 | 4689 | 0.0 | 0.0 | 0.0 |
1986 | 3142 | 0.0 | 0.0 | 0.0 |
1987 | 5274 | 0.0 | 0.0 | 0.0 |
1988 | 5582 | 0.0 | 0.0 | 0.0 |
1989 | 3736 | 0.0 | 0.0 | 0.0 |
1990 | 6101 | 0.0 | 0.0 | 0.0 |
1991 | 4096 | 0.0 | 0.0 | 0.0 |
1992 | 5114 | 0.0 | 0.0 | 0.0 |
1993 | 7477 | 0.0 | 0.0 | 0.0 |
1994 | 8637 | 0.0 | 0.0 | 0.0 |
1995 | 8683 | 0.0 | 0.0 | 0.0 |
1997 | 866 | 0.0 | 0.0 | 0.0 |
1998 | 7036 | 0.0 | 0.0 | 0.0 |
2005 | 499 | 0.0 | 0.0 | 0.0 |
2006 | 6551 | 0.0 | 0.0 | 0.0 |
2007 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1979-04-01 | Lost Circulation | 640.00 | 640.00 |
For data sources see[6]