If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0544090510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.639489,"lon":-111.291904,"icon":""}]} |
Location: 00/10-05-054-09W4/0 | |
Location Alias: 00/10-05-54-09 W4M | |
Location Alias 2: 00/10-05-054-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 054 | |
Meridian: 4 | |
Range: 09 | |
Section: 05 | |
County/Municipality: County of Two Hills No. 21 | |
Well Name: NORWEST MYRNAM 10-5-54-9 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0055967 | |
License Date: 1975-11-26 | |
License Status: RecCertified | |
Spud Date: 1975-12-30 | |
Final Drill Date: 1976-01-05 | |
Well Total Depth: 707.10 m | |
Surface Hole Latitude: 53.639489 | |
Surface Hole Longitude: -111.291904 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-11-26 | Obtained License |
1976-01-05 | Finished Drilling |
1976-01-06 | Production Casing Operation Performed |
1976-03-27 | Perforation Treatment Performed - Jet Perforation |
1976-04-28 | Well Mode changed to Drilled and Cased |
1976-12-22 | Well Began Production |
1976-12-22 | Well Fluid changed to Gas |
1976-12-22 | Well Mode changed to Flowing |
1979-02-20 | Perforation Treatment Performed - Jet Perforation |
1979-02-20 | Well Fluid changed to Gas |
1979-02-20 | Well Mode changed to Flowing |
1979-06-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-11-10 | Perforation Treatment Performed - Cement Squeeze |
1981-11-12 | Perforation Treatment Performed - Jet Perforation |
1985-11-15 | Perforation Treatment Performed - Jet Perforation |
1985-11-15 | Well Log Performed |
1986-01-24 | Perforation Treatment Performed - Jet Perforation |
1986-01-24 | Well Log Performed |
1986-01-25 | Perforation Treatment Performed - Cement Squeeze |
1986-01-27 | Well Log Performed |
1986-01-28 | Perforation Treatment Performed - Jet Perforation |
1992-06-01 | Well Fluid changed to Gas |
1992-06-01 | Well Mode changed to Suspended |
1999-08-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-08-07 | Plug Back Performed |
1999-08-07 | Well Fluid changed to Gas |
1999-08-07 | Well Mode changed to Abandoned Zone |
1999-09-03 | Perforation Treatment Performed - Jet Perforation |
1999-09-07 | Perforation Treatment Performed - Remedial Casing |
1999-09-16 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-03-27 | Perforation | 532.80 | 534.00 | 7 |
1986-01-24 | Perforation | 540.00 | 540.60 | 13 |
1986-01-25 | Cement Squeeze | 536.40 | 540.60 | 0 |
1986-01-28 | Perforation | 532.00 | 534.00 | 13 |
1986-01-28 | Perforation | 536.40 | 537.60 | 13 |
1999-08-07 | Packing Device Capped w/Cement | 517.00 | 525.00 | 0 |
1999-08-07 | Packing Device Capped w/Cement | 482.00 | 490.00 | 0 |
1999-09-03 | Perforation | 297.00 | 298.00 | 11 |
1999-09-07 | Remedial Casing Cementing | 297.00 | 298.00 | 0 |
1976-03-27 | Perforation | 536.40 | 538.00 | 7 |
1976-03-27 | Perforation | 540.10 | 541.30 | 7 |
1979-02-20 | Perforation | 493.80 | 497.40 | 7 |
1979-06-19 | Acid Treatment | 493.80 | 497.40 | 0 |
1981-11-10 | Cement Squeeze | 532.80 | 541.30 | 0 |
1981-11-12 | Perforation | 532.80 | 534.00 | 13 |
1985-11-15 | Perforation | 532.80 | 534.30 | 13 |
1985-11-15 | Perforation | 536.40 | 537.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 235 | 0.0 | 0.0 | 0.0 |
1977 | 7267 | 0.0 | 0.0 | 0.0 |
1978 | 8145 | 0.0 | 0.0 | 0.0 |
1979 | 8352 | 0.0 | 0.0 | 0.0 |
1980 | 8669 | 0.0 | 0.0 | 0.0 |
1981 | 7357 | 0.0 | 0.0 | 0.0 |
1982 | 8695 | 0.0 | 0.0 | 0.0 |
1983 | 8645 | 0.0 | 0.0 | 0.0 |
1984 | 8245 | 0.0 | 0.0 | 0.0 |
1985 | 7595 | 0.0 | 0.0 | 0.0 |
1986 | 6392 | 0.0 | 0.0 | 0.0 |
1987 | 5194 | 0.0 | 0.0 | 0.0 |
For data sources see[5]