X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544071514002

Well Details

Well ID: 0544071514002
Loading map...
Location: 00/14-15-054-07W4/2
Location Alias: 00/14-15-54-07 W4M
Location Alias 2: 00/14-15-054-07 W4/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 07
Section: 15
County/Municipality: County of Two Hills No. 21
Well Name: NORCEN ST. PAUL 14-15-54-7
Operator Name: Canadian Natural Resources Limited
License Number: 0202543
License Date: 1997-06-13
License Status: Suspension
Spud Date: 1997-07-07
Final Drill Date: 1997-07-09
Well Total Depth: 644.00 m
Surface Hole Latitude: 53.668667
Surface Hole Longitude: -110.953112

For data sources see[1][2]

Well History

Date Event
1997-06-13 Obtained License
1997-07-08 Surface Casing Operation Performed
1997-07-09 Finished Drilling
1997-07-09 Well Log Performed
1997-07-09 Well Mode changed to Drilled and Cased
1997-07-10 Production Casing Operation Performed
1997-07-11 Rig Released
1997-08-05 Perforation Treatment Performed - Jet Perforation
2007-10-27 Perforation Treatment Performed - Casing Patch (Over Perfs)
2007-10-29 Perforation Treatment Performed - Jet Perforation
2007-11-01 Well Began Production
2007-11-01 Well Fluid changed to Crude Bitumen
2007-11-01 Well Mode changed to Pumping
2008-03-13 Perforation Treatment Performed - Chemical Squeeze
2008-10-31 Well Fluid changed to Crude Bitumen
2008-10-31 Well Mode changed to Suspended
2010-09-21 Perforation Treatment Performed - Cement Plug
2010-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-23 Perforation Treatment Performed - Jet Perforation
2010-09-23 Plug Back Performed
2010-09-23 Well Fluid changed to Crude Bitumen
2010-09-23 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-05 Perforation 483.50 485.50 26
2007-10-27 Casing Patch 483.50 485.50 0
2007-10-29 Perforation 539.00 540.70 26
2008-03-13 Chemical Squeeze 539.00 540.70 0
2010-09-21 Cement Plug 541.00 644.00 0
2010-09-23 Packing Device Capped w/Cement 515.00 534.00 0
2010-09-23 Perforation 492.50 494.00 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1349 0.0 0.0 0.0
2008 5878 0.0 0.0 0.0

For data sources see[5]

References