X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0544071309002

Well Details

Well ID: 0544071309002
Loading map...
Location: 00/09-13-054-07W4/2
Location Alias: 00/09-13-54-07 W4M
Location Alias 2: 00/09-13-054-07 W4/02
Country: Canada
Province: Alberta
Township: 054
Meridian: 4
Range: 07
Section: 13
County/Municipality: County of Two Hills No. 21
Well Name: CNRL 9C ST. PAUL 9-13-54-7
Operator Name: Canadian Natural Resources Limited
License Number: 0337435
License Date: 2005-08-31
License Status: Suspension
Spud Date: 2005-09-21
Final Drill Date: 2005-09-22
Well Total Depth: 694.00 m
Surface Hole Latitude: 53.667130
Surface Hole Longitude: -110.899476

For data sources see[1][2]

Well History

Date Event
2005-08-31 Obtained License
2005-09-21 Direction Drilling Operation Performed - Deviate
2005-09-21 Surface Casing Operation Performed
2005-09-22 Finished Drilling
2005-09-22 Well Log Performed
2005-09-22 Well Mode changed to Drilled and Cased
2005-09-23 Production Casing Operation Performed
2005-09-23 Rig Released
2005-10-08 Perforation Treatment Performed - Jet Perforation
2005-10-08 Well Log Performed
2006-12-02 Perforation Treatment Performed - Jet Perforation
2007-07-08 Well Log Performed
2007-07-09 Perforation Treatment Performed - Casing Patch (Over Perfs)
2007-07-10 Perforation Treatment Performed - Jet Perforation
2007-07-11 Well Began Production
2007-07-11 Well Fluid changed to Crude Bitumen
2007-07-11 Well Mode changed to Pumping
2009-08-18 Perforation Treatment Performed - Jet Perforation
2010-08-11 Perforation Treatment Performed - Cement Plug
2010-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-12 Perforation Treatment Performed - Jet Perforation
2010-08-12 Plug Back Performed
2010-08-12 Well Fluid changed to Crude Bitumen
2010-08-12 Well Mode changed to Abandoned Zone
2018-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-01 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-09-21 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-08 Perforation 526.00 527.00 26
2010-08-12 Perforation 511.50 513.00 26
2018-11-01 Packing Device Capped w/Cement 514.50 523.00 0
2018-11-01 Packing Device Capped w/Cement 492.50 501.00 0
2005-10-08 Perforation 530.50 532.50 26
2006-12-02 Perforation 526.00 527.00 13
2006-12-02 Perforation 530.50 532.50 13
2007-07-09 Casing Patch 526.00 532.50 0
2007-07-10 Perforation 560.00 562.00 26
2009-08-18 Perforation 560.00 562.00 13
2010-08-11 Cement Plug 563.70 689.00 0
2010-08-12 Packing Device Capped w/Cement 535.00 554.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 3894 0.0 0.0 0.0
2008 8674 0.0 0.0 0.0
2009 8612 0.0 0.0 0.0
2010 4080 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References