X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535202513004

Well Details

Well ID: 0535202513004
Loading map...
Location: 00/13-25-053-20W5/4
Location Alias: 00/13-25-53-20 W5M
Location Alias 2: 00/13-25-053-20 W5/04
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 20
Section: 25
County/Municipality: Yellowhead County
Well Name: ENERMARK ANSELL 13-25-53-20
Operator Name: Enerplus Corporation
License Number: 0258685
License Date: 2001-08-20
License Status: Re-Entered
Spud Date: 2001-08-31
Final Drill Date: 2001-10-13
Well Total Depth: 3099.00 m
Surface Hole Latitude: 53.611050
Surface Hole Longitude: -116.824334

For data sources see[1][2]

Well History

Date Event
2001-08-20 Obtained License
2001-09-02 Lost Circulation Occurred
2001-09-04 Surface Casing Operation Performed
2001-09-16 Direction Drilling Operation Performed - Deviate
2001-09-24 Kick Occurred
2001-09-25 Drill Stem Test Performed
2001-10-13 Finished Drilling
2001-10-13 Well Log Performed
2001-10-13 Well Mode changed to Drilled and Cased
2001-10-16 Production Casing Operation Performed
2001-10-18 Rig Released
2001-10-19 Well Log Performed
2001-10-21 Well Log Performed
2001-11-09 Perforation Treatment Performed - Jet Perforation
2001-11-09 Well Log Performed
2001-11-10 Perforation Treatment Performed - Chemical Squeeze
2001-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-12 Plug Back Performed
2001-11-12 Well Log Performed
2001-11-13 Perforation Treatment Performed - Jet Perforation
2001-11-13 Well Log Performed
2001-11-15 Perforation Treatment Performed - Fractured
2001-11-21 Perforation Treatment Performed - Jet Perforation
2001-11-23 Perforation Treatment Performed - Fractured
2001-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-06 Plug Back Performed
2001-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-07 Perforation Treatment Performed - Jet Perforation
2001-12-07 Plug Back Performed
2001-12-07 Well Log Performed
2001-12-10 Perforation Treatment Performed - Fractured
2001-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-14 Plug Back Performed
2001-12-14 Well Log Performed
2001-12-14 Well Mode changed to Abandoned Zone
2001-12-15 Well Abandoned
2001-12-15 Well Mode changed to Abandoned and Re-entered
2005-11-20 Well Log Performed
2005-12-08 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-09-16 1781.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-11-09 Perforation 3052.00 3060.00 17
2001-12-07 Perforation 2138.00 2140.00 17
2001-12-07 Perforation 2130.00 2134.00 17
2001-12-10 Fracture 2130.00 2140.00 0
2001-12-14 Packing Device Capped w/Cement 2117.00 2125.00 0
2001-11-10 Chemical Squeeze 3052.00 3060.00 0
2001-11-12 Packing Device Capped w/Cement 3042.00 3049.00 0
2001-11-13 Perforation 2805.50 2813.50 17
2001-11-15 Fracture 2805.50 2813.50 0
2001-11-21 Perforation 2570.00 2572.00 17
2001-11-23 Fracture 2570.00 2572.00 0
2001-12-06 Packing Device Capped w/Cement 2785.50 2790.50 0
2001-12-07 Packing Device Capped w/Cement 2556.00 2565.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2001-09-02 Lost Circulation 364.00 422.00
2001-09-24 Kick 2523.00 2560.00

For data sources see[6]

References