If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0535152507000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.603614,"lon":-116.072982,"icon":""}]} |
Location: 00/07-25-053-15W5/0 | |
Location Alias: 00/07-25-53-15 W5M | |
Location Alias 2: 00/07-25-053-15 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 053 | |
Meridian: 5 | |
Range: 15 | |
Section: 25 | |
County/Municipality: Yellowhead County | |
Well Name: SUNCOR ROSEVEAR 7-25-53-15 | |
Operator Name: Suncor Energy Inc. | |
License Number: 0053312 | |
License Date: 1975-03-14 | |
License Status: Re-Entered | |
Spud Date: 1975-03-16 | |
Final Drill Date: 1975-04-27 | |
Well Total Depth: 3505.80 m | |
Surface Hole Latitude: 53.603614 | |
Surface Hole Longitude: -116.072982 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-03-14 | Obtained License |
1975-04-27 | Finished Drilling |
1975-04-28 | Well Log Performed |
1975-05-01 | Production Casing Operation Performed |
1975-11-05 | Well Log Performed |
1975-11-10 | Perforation Treatment Performed - Jet Perforation |
1975-11-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-11-28 | Perforation Treatment Performed - Cement Squeeze |
1975-11-29 | Perforation Treatment Performed - Cement Squeeze |
1975-12-04 | Perforation Treatment Performed - Jet Perforation |
1975-12-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-01-19 | Well Log Performed |
1976-01-30 | Perforation Treatment Performed - Cement Squeeze |
1976-02-03 | Perforation Treatment Performed - Jet Perforation |
1976-02-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-02-16 | Well Mode changed to Drilled and Cased |
1979-10-01 | Well Log Performed |
1989-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-07-26 | Plug Back Performed |
1989-07-26 | Well Mode changed to Abandoned and Re-entered |
1989-07-27 | Well Abandoned |
1995-08-29 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-11-10 | Perforation | 3277.80 | 3287.60 | 7 |
1989-07-26 | Packing Device Capped w/Cement | 3201.00 | 3209.00 | 0 |
1989-07-26 | Packing Device Capped w/Cement | 1332.00 | 1340.00 | 0 |
1975-11-12 | Acid Treatment | 3277.80 | 3287.60 | 0 |
1975-11-28 | Cement Squeeze | 3277.80 | 3287.60 | 0 |
1975-11-29 | Cement Squeeze | 3277.80 | 3287.60 | 0 |
1975-12-04 | Perforation | 3262.00 | 3265.90 | 7 |
1975-12-06 | Acid Treatment | 3262.00 | 3265.90 | 0 |
1976-01-30 | Cement Squeeze | 3262.00 | 3265.90 | 0 |
1976-02-03 | Perforation | 3262.60 | 3264.40 | 7 |
1976-02-08 | Acid Treatment | 3262.60 | 3264.40 | 0 |
For data sources see[4]