X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535152507000

Well Details

Well ID: 0535152507000
Loading map...
Location: 00/07-25-053-15W5/0
Location Alias: 00/07-25-53-15 W5M
Location Alias 2: 00/07-25-053-15 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 15
Section: 25
County/Municipality: Yellowhead County
Well Name: SUNCOR ROSEVEAR 7-25-53-15
Operator Name: Suncor Energy Inc.
License Number: 0053312
License Date: 1975-03-14
License Status: Re-Entered
Spud Date: 1975-03-16
Final Drill Date: 1975-04-27
Well Total Depth: 3505.80 m
Surface Hole Latitude: 53.603614
Surface Hole Longitude: -116.072982

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-03-14 Obtained License
1975-04-27 Finished Drilling
1975-04-28 Well Log Performed
1975-05-01 Production Casing Operation Performed
1975-11-05 Well Log Performed
1975-11-10 Perforation Treatment Performed - Jet Perforation
1975-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-28 Perforation Treatment Performed - Cement Squeeze
1975-11-29 Perforation Treatment Performed - Cement Squeeze
1975-12-04 Perforation Treatment Performed - Jet Perforation
1975-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-19 Well Log Performed
1976-01-30 Perforation Treatment Performed - Cement Squeeze
1976-02-03 Perforation Treatment Performed - Jet Perforation
1976-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-16 Well Mode changed to Drilled and Cased
1979-10-01 Well Log Performed
1989-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-26 Plug Back Performed
1989-07-26 Well Mode changed to Abandoned and Re-entered
1989-07-27 Well Abandoned
1995-08-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-10 Perforation 3277.80 3287.60 7
1989-07-26 Packing Device Capped w/Cement 3201.00 3209.00 0
1989-07-26 Packing Device Capped w/Cement 1332.00 1340.00 0
1975-11-12 Acid Treatment 3277.80 3287.60 0
1975-11-28 Cement Squeeze 3277.80 3287.60 0
1975-11-29 Cement Squeeze 3277.80 3287.60 0
1975-12-04 Perforation 3262.00 3265.90 7
1975-12-06 Acid Treatment 3262.00 3265.90 0
1976-01-30 Cement Squeeze 3262.00 3265.90 0
1976-02-03 Perforation 3262.60 3264.40 7
1976-02-08 Acid Treatment 3262.60 3264.40 0

For data sources see[4]



References