X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535151707000

Well Details

Well ID: 0535151707000
Loading map...
Location: 00/07-17-053-15W5/0
Location Alias: 00/07-17-53-15 W5M
Location Alias 2: 00/07-17-053-15 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 15
Section: 17
County/Municipality: Yellowhead County
Well Name: CHEVRON ROSEVEAR 7-17-53-15
Operator Name: Chevron Canada Limited
License Number: 0150965
License Date: 1991-12-10
License Status: Re-Entered
Spud Date: 1991-12-17
Final Drill Date: 1992-02-05
Well Total Depth: 3503.00 m
Surface Hole Latitude: 53.576873
Surface Hole Longitude: -116.174980

For data sources see[1][2]

Well History

Date Event
1991-12-10 Obtained License
1991-12-17 Well Log Performed
1991-12-19 Surface Casing Operation Performed
1992-01-15 Well Log Performed
1992-01-16 Well Log Performed
1992-01-29 Production Casing Operation Performed
1992-02-05 Finished Drilling
1992-02-05 Well Log Performed
1992-02-05 Well Mode changed to Drilled and Cased
1992-02-06 Well Fluid changed to Gas
1992-02-06 Well Mode changed to Testing
1992-02-07 Plug Back Performed
1992-02-09 Rig Released
1992-02-15 Well Log Performed
1992-02-16 Well Log Performed
1992-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-18 Perforation Treatment Performed - Jet Perforation
1992-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-22 Well Log Performed
1992-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-23 Perforation Treatment Performed - Jet Perforation
1992-02-27 Perforation Treatment Performed - Cement Squeeze
1992-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-03-01 Plug Back Performed
1992-03-01 Well Log Performed
1992-03-02 Perforation Treatment Performed - Jet Perforation
1992-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-03-12 Perforation Treatment Performed - Jet Perforation
1992-03-12 Plug Back Performed
1992-03-12 Well Log Performed
1992-03-13 Perforation Treatment Performed - Remedial Casing
1992-03-13 Well Abandoned
1992-03-13 Well Fluid changed to Gas
1992-03-13 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-18 Perforation 2920.00 2933.00 13
1992-03-01 Packing Device Capped w/Cement 2376.00 2384.00 0
1992-03-02 Perforation 2324.90 2335.00 13
1992-03-12 Packing Device Capped w/Cement 2308.00 2311.00 0
1992-03-12 Perforation 460.00 460.30 13
1992-03-13 Remedial Casing Cementing 460.00 460.30 0
1992-02-18 Perforation 2939.00 2941.00 13
1992-02-18 Perforation 2946.00 2959.60 13
1992-02-18 Acid Treatment 2920.00 2959.60 0
1992-02-19 Acid Treatment 2920.00 2959.60 0
1992-02-21 Packing Device Capped w/Cement 2871.70 2882.80 0
1992-02-23 Perforation 2755.00 2765.00 13
1992-02-23 Acid Treatment 2755.00 2765.00 0
1992-02-27 Cement Squeeze 2755.00 2765.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 24 0.0 0.0 0.0

For data sources see[5]

References