X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535131506002

Well Details

Well ID: 0535131506002
Loading map...
Location: 00/06-15-053-13W5/2
Location Alias: 00/06-15-53-13 W5M
Location Alias 2: 00/06-15-053-13 W5/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 13
Section: 15
County/Municipality: Yellowhead County
Well Name: ESSO ET AL CARROT 6-15-53-13
Operator Name: Imperial Oil Resources Limited
License Number: 0100799
License Date: 1983-02-28
License Status: Re-Entered
Spud Date: 1983-03-03
Final Drill Date: 1983-03-26
Well Total Depth: 2238.00 m
Surface Hole Latitude: 53.577159
Surface Hole Longitude: -115.836609

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-02-28 Obtained License
1983-03-13 Well Log Performed
1983-03-14 Drill Stem Test Performed
1983-03-15 Drill Stem Test Performed
1983-03-26 Finished Drilling
1983-03-26 Well Mode changed to Drilled and Cased
1983-03-27 Drill Stem Test Performed
1983-03-27 Well Log Performed
1983-03-31 Production Casing Operation Performed
1983-05-29 Perforation Treatment Performed - Jet Perforation
1983-06-05 Perforation Treatment Performed - Fractured
1983-07-06 Perforation Treatment Performed - Jet Perforation
1983-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-15 Perforation Treatment Performed - Cement Squeeze
1983-07-19 Perforation Treatment Performed - Jet Perforation
1983-08-19 Perforation Treatment Performed - Cement Squeeze
1983-08-24 Perforation Treatment Performed - Jet Perforation
1983-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-01 Well Began Production
1983-10-01 Well Fluid changed to Crude Oil
1983-10-01 Well Mode changed to Pumping
1984-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-09 Perforation Treatment Performed - Fractured
1984-06-09 Well Fluid changed to Crude Oil
1984-06-09 Well Mode changed to Pumping
1991-01-04 Well Fluid changed to Crude Oil
1991-01-04 Well Mode changed to Suspended
1994-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-02 Plug Back Performed
1994-08-02 Well Fluid changed to Crude Oil
1994-08-02 Well Log Performed
1994-08-02 Well Mode changed to Abandoned and Re-entered
1994-09-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-05-29 Perforation 2161.50 2165.50 13
1983-08-25 Acid Treatment 1591.50 1593.00 0
1983-09-30 Acid Treatment 1591.50 1593.00 0
1984-06-07 Packing Device Capped w/Cement 2132.00 2140.00 0
1984-06-09 Fracture 1591.50 1593.00 0
1994-08-02 Packing Device Capped w/Cement 1603.20 1611.20 0
1994-08-02 Packing Device Capped w/Cement 1567.00 1575.00 0
1983-06-05 Fracture 2161.50 2165.50 0
1983-07-06 Perforation 1908.50 1909.50 13
1983-07-06 Perforation 1914.00 1916.00 7
1983-07-07 Acid Treatment 1908.50 1916.00 0
1983-07-15 Cement Squeeze 1908.50 1916.00 0
1983-07-19 Perforation 1582.50 1585.50 7
1983-08-19 Cement Squeeze 1582.50 1585.50 0
1983-08-24 Perforation 1591.50 1593.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1603 0.0 0.0 0.0
1984 5164 0.0 0.0 0.0
1985 6823 0.0 0.0 0.0
1986 6867 0.0 0.0 0.0
1987 5212 0.0 0.0 0.0
1988 3628 0.0 0.0 0.0
1989 1639 0.0 0.0 0.0
1990 2423 0.0 0.0 0.0
1991 72 0.0 0.0 0.0

For data sources see[5]

References