X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535103403002

Well Details

Well ID: 0535103403002
Loading map...
Location: 00/03-34-053-10W5/2
Location Alias: 00/03-34-53-10 W5M
Location Alias 2: 00/03-34-053-10 W5/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 10
Section: 34
County/Municipality: Yellowhead County
Well Name: DAYLIGHT HZ CHIP LK 3-34-53-10
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0435724
License Date: 2011-08-04
License Status: Amended
Spud Date: 2011-09-21
Final Drill Date: 2011-10-21
Well Total Depth: 3074.00 m
Surface Hole Latitude: 53.618697
Surface Hole Longitude: -115.375059

For data sources see[1][2]

Well History

Date Event
2011-08-04 Obtained License
2011-09-23 Surface Casing Operation Performed
2011-09-25 Direction Drilling Operation Performed - Horizontal
2011-09-28 Intermediate Casing Operation Performed
2011-10-05 Direction Drilling Operation Performed - Horizontal
2011-10-21 Finished Drilling
2011-10-21 Well Log Performed
2011-10-21 Well Mode changed to Drilled and Cased
2011-10-25 Liner Casing Operation Performed
2011-10-26 Rig Released
2011-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-13 Perforation Treatment Performed - Open-Hole Completion
2011-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-01 Well Began Production
2011-12-01 Well Fluid changed to Crude Oil
2011-12-01 Well Mode changed to Flowing
2012-07-02 Well Fluid changed to Crude Oil
2012-07-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-25 1492.00 Horizontal
2011-10-05 1997.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-13 Open Hole/Barefoot Completion 3070.00 3074.00 0
2011-11-13 Multi-Stage Fracture 3023.30 3023.40 0
2011-11-16 Multi-Stage Fracture 2921.60 2921.70 0
2011-11-16 Multi-Stage Fracture 2814.40 2814.50 0
2011-11-16 Multi-Stage Fracture 2717.60 2717.70 0
2011-11-16 Multi-Stage Fracture 2223.20 2223.30 0
2011-11-16 Multi-Stage Fracture 2116.70 2116.80 0
2011-11-16 Multi-Stage Fracture 2034.90 2035.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 598 0.0 0.0 0.0
2012 8030 0.0 0.0 0.0
2013 8326 0.0 0.0 0.0
2014 8750 0.0 0.0 0.0
2015 7559 0.0 0.0 0.0
2016 4296 0.0 0.0 0.0
2017 8615 0.0 0.0 0.0
2018 8586 0.0 0.0 0.0
2019 8469 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References