X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535092809022

Well Details

Well ID: 0535092809022
Loading map...
Location: 02/09-28-053-09W5/2
Location Alias: 02/09-28-53-09 W5M
Location Alias 2: 02/09-28-053-09 W5/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 09
Section: 28
County/Municipality: Yellowhead County
Well Name: DEWPOINT WILDWD 9-28-53-9
Operator Name: Dewpoint Resources Ltd.
License Number: 0244258
License Date: 2000-11-09
License Status: Abandoned
Spud Date: 2000-11-21
Final Drill Date: 2000-12-04
Well Total Depth: 2102.00 m
Surface Hole Latitude: 53.600289
Surface Hole Longitude: -115.256832

For data sources see[1][2]

Well History

Date Event
2000-11-09 Obtained License
2000-11-22 Surface Casing Operation Performed
2000-11-24 Direction Drilling Operation Performed - Deviate
2000-12-03 Well Log Performed
2000-12-04 Finished Drilling
2000-12-04 Well Mode changed to Drilled and Cased
2000-12-08 Well Log Performed
2000-12-11 Production Casing Operation Performed
2000-12-12 Rig Released
2000-12-19 Well Log Performed
2000-12-20 Perforation Treatment Performed - Jet Perforation
2000-12-20 Well Log Performed
2001-01-03 Well Log Performed
2001-01-05 Perforation Treatment Performed - Jet Perforation
2001-01-05 Well Log Performed
2001-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-06 Plug Back Performed
2001-01-06 Well Log Performed
2001-01-07 Perforation Treatment Performed - Jet Perforation
2001-01-07 Well Log Performed
2001-01-07 Well Mode changed to Drilled and Cased
2001-01-09 Perforation Treatment Performed - Fractured
2005-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-27 Plug Back Performed
2005-10-27 Well Mode changed to Abandoned Zone
2005-10-28 Perforation Treatment Performed - Jet Perforation
2005-10-28 Well Log Performed
2005-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-30 Perforation Treatment Performed - Jet Perforation
2005-10-30 Plug Back Performed
2019-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-07 Plug Back Performed
2019-02-07 Well Log Performed
2019-03-14 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-11-24 774.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-12-20 Perforation 2070.00 2074.00 17
2005-10-30 Perforation 385.00 386.00 17
2005-10-30 Perforation 388.00 389.00 17
2005-10-30 Perforation 390.50 391.50 17
2005-10-30 Perforation 392.00 393.00 17
2005-10-30 Perforation 394.50 395.00 17
2019-02-07 Packing Device Capped w/Cement 367.00 375.00 0
2001-01-05 Perforation 2042.00 2045.00 17
2001-01-06 Packing Device Capped w/Cement 2057.00 2065.00 0
2001-01-07 Perforation 2018.00 2020.00 17
2001-01-09 Fracture 2018.00 2020.00 0
2005-10-27 Packing Device Capped w/Cement 2031.00 2039.00 0
2005-10-27 Packing Device Capped w/Cement 2007.00 2015.00 0
2005-10-28 Perforation 759.00 764.00 17
2005-10-30 Packing Device Capped w/Cement 747.00 755.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References