X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534263610032

Well Details

Well ID: 0534263610032
Loading map...
Location: 03/10-36-053-26W4/2
Location Alias: 03/10-36-53-26 W4M
Location Alias 2: 03/10-36-053-26 W4/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 36
County/Municipality: Sturgeon County
Well Name: DAYLIGHT 103 STAL-BLK 10-36-53-26
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0295974
License Date: 2003-11-12
License Status: Suspension
Spud Date: 2003-11-19
Final Drill Date: 2003-12-22
Well Total Depth: 1429.60 m
Surface Hole Latitude: 53.622579
Surface Hole Longitude: -113.699082

For data sources see[1][2]

Well History

Date Event
2003-11-12 Obtained License
2003-11-19 Direction Drilling Operation Performed - Deviate
2003-11-20 Surface Casing Operation Performed
2003-11-25 Intermediate Casing Operation Performed
2003-11-25 Well Log Performed
2003-11-28 Well Log Performed
2003-11-29 Well Log Performed
2003-11-30 Liner Casing Operation Performed
2003-12-01 Rig Released
2003-12-02 Well Log Performed
2003-12-05 Well Log Performed
2003-12-16 Well Log Performed
2003-12-17 Well Log Performed
2003-12-18 Well Log Performed
2003-12-22 Finished Drilling
2003-12-22 Well Mode changed to Drilled and Cased
2003-12-23 Perforation Treatment Performed - Jet Perforation
2003-12-23 Well Log Performed
2003-12-24 Perforation Treatment Performed - Open-Hole Completion
2003-12-24 Perforation Treatment Performed - Remedial Casing
2004-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-18 Plug Back Performed
2004-01-19 Perforation Treatment Performed - Jet Perforation
2004-01-19 Well Log Performed
2004-02-20 Well Began Production
2004-02-20 Well Fluid changed to Crude Oil
2004-02-20 Well Mode changed to Flowing
2009-05-01 Well Fluid changed to Crude Oil
2009-05-01 Well Mode changed to Suspended
2012-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-02 Well Log Performed
2017-02-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-11-19 725.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-12-23 Perforation 239.00 240.00 17
2003-12-24 Remedial Casing Cementing 239.00 240.00 0
2003-12-24 Open Hole/Barefoot Completion 1379.00 1429.60 0
2004-01-18 Packing Device Capped w/Cement 1351.00 1429.00 0
2004-01-19 Perforation 1326.00 1327.00 17
2004-01-19 Perforation 1329.00 1330.00 17
2004-01-19 Perforation 1332.00 1333.50 17
2012-09-08 Packing Device Capped w/Cement 1310.00 1318.00 0
2017-02-03 Perforation 421.00 422.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 2789 0.0 0.0 0.0
2005 2023 0.0 0.0 0.0
2006 432 0.0 0.0 0.0
2007 3067 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-08 No Incident Encountered 0.00 0.00
2012-09-08 No Incident Encountered 0.00 0.00
2017-02-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References