X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534262506002

Well Details

Well ID: 0534262506002
Loading map...
Location: 00/06-25-053-26W4/2
Location Alias: 00/06-25-53-26 W4M
Location Alias 2: 00/06-25-053-26 W4/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 25
County/Municipality: Sturgeon County
Well Name: DAYLIGHT STAL-BLK 6-25-53-26
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0012514
License Date: 1956-10-23
License Status: Suspension
Spud Date: 1956-11-28
Final Drill Date: 1956-12-29
Well Total Depth: 1450.80 m
Surface Hole Latitude: 53.604755
Surface Hole Longitude: -113.704391

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-10-23 Obtained License
1956-12-12 Drill Stem Test Performed
1956-12-18 Drill Stem Test Performed
1956-12-19 Drill Stem Test Performed
1956-12-20 Drill Stem Test Performed
1956-12-22 Liner Casing Operation Performed
1956-12-29 Finished Drilling
1956-12-29 Well Mode changed to Drilled and Cased
1957-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-01-02 Perforation Treatment Performed - Jet Perforation
1996-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-22 Plug Back Performed
1996-11-27 Well Log Performed
1997-11-17 Perforation Treatment Performed - Jet Perforation
1998-12-14 Well Began Production
1998-12-14 Well Fluid changed to Gas
1998-12-14 Well Mode changed to Flowing
2001-10-23 Well Log Performed
2001-10-24 Perforation Treatment Performed - Cement Squeeze
2001-10-24 Plug Back Performed
2001-10-24 Well Fluid changed to Gas
2001-10-24 Well Mode changed to Abandoned Zone
2001-10-26 Perforation Treatment Performed - Jet Perforation
2001-10-26 Well Log Performed
2001-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-27 Plug Back Performed
2001-10-27 Well Log Performed
2001-10-28 Perforation Treatment Performed - Jet Perforation
2001-10-28 Well Log Performed
2001-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-30 Perforation Treatment Performed - Jet Perforation
2001-10-31 Well Log Performed
2002-08-09 Perforation Treatment Performed - Cement Squeeze
2002-08-09 Plug Back Performed
2002-08-10 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-01-02 Perforation 1444.80 1446.20 13
2001-10-30 Perforation 1116.00 1120.00 17
2002-08-09 Cement Squeeze 1116.00 1120.00 0
1957-01-02 Acid Treatment 1444.80 1446.20 0
1996-11-22 Packing Device Capped w/Cement 1427.00 1435.00 0
1997-11-17 Perforation 1136.90 1140.00 13
2001-10-24 Cement Squeeze 1136.90 1140.00 0
2001-10-26 Perforation 1210.00 1217.50 17
2001-10-27 Packing Device Capped w/Cement 1200.00 1208.00 0
2001-10-28 Perforation 1179.50 1181.00 17
2001-10-30 Packing Device Capped w/Cement 1167.00 1175.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 420 0.0 0.0 0.0
1999 8263 0.0 0.0 0.0
2000 6806 0.0 0.0 0.0
2001 5985 0.0 0.0 0.0

For data sources see[5]

References