X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534251011000

Well Details

Well ID: 0534251011000
Loading map...
Location: 00/11-10-053-25W4/0
Location Alias: 00/11-10-53-25 W4M
Location Alias 2: 00/11-10-053-25 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 25
Section: 10
County/Municipality: Edmonton
Well Name: DOME JASPER PLACE 11-10-53-25
Operator Name: BP Canada Energy Group ULC
License Number: 0012271
License Date: 1956-09-17
License Status: RecExempt
Spud Date: 1956-09-24
Final Drill Date: 1956-10-12
Well Total Depth: 1202.70 m
Surface Hole Latitude: 53.564854
Surface Hole Longitude: -113.606205

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-09-17 Obtained License
1956-10-05 Drill Stem Test Performed
1956-10-09 Drill Stem Test Performed
1956-10-11 Drill Stem Test Performed
1956-10-12 Finished Drilling
1956-10-13 Production Casing Operation Performed
1956-10-27 Perforation Treatment Performed - Bullet Perforation
1956-10-31 Perforation Treatment Performed - Visqueeze
1957-08-30 Well Mode changed to Drilled and Cased
1960-08-29 Well Began Production
1960-08-29 Well Fluid changed to Gas
1960-08-29 Well Mode changed to Flowing
1961-03-09 Perforation Treatment Performed - Jet Perforation
1961-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-11 Perforation Treatment Performed - Cement Squeeze
1961-03-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-04-21 Perforation Treatment Performed - Cement Squeeze
1961-04-22 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-04-22 Perforation Treatment Performed - Fractured
1961-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-21 Well Fluid changed to Crude Oil
1961-06-21 Well Mode changed to Pumping
1962-07-22 Perforation Treatment Performed - Cement Plug
1962-07-25 Well Abandoned
1962-07-25 Well Fluid changed to Crude Oil
1962-07-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-10-27 Bullet Perforation 1164.30 1165.60 20
1961-05-05 Acid Treatment 1160.10 1161.30 0
1962-07-22 Cement Plug 1143.00 1169.20 0
1956-10-31 Visqueeze 1164.30 1165.60 0
1961-03-09 Perforation 1172.90 1173.50 13
1961-03-11 Acid Treatment 1172.90 1173.50 0
1961-03-11 Cement Squeeze 1164.30 1173.50 0
1961-03-18 Hydra Jet Perforation 1164.30 1164.30 0
1961-04-21 Cement Squeeze 1164.30 1164.30 0
1961-04-22 Hydra Jet Perforation 1160.10 1161.30 0
1961-04-22 Fracture 1160.10 1161.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References