X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534133601024

Well Details

Well ID: 0534133601024
Loading map...
Location: 02/01-36-053-13W4/4
Location Alias: 02/01-36-53-13 W4M
Location Alias 2: 02/01-36-053-13 W4/04
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 13
Section: 36
County/Municipality: County of Two Hills No. 21
Well Name: SPIL PLAIN 1-36-53-13
Operator Name: Golden Coast Energy Corp.
License Number: 0332150
License Date: 2005-06-02
License Status: Suspension
Spud Date: 2005-06-11
Final Drill Date: 2005-06-13
Well Total Depth: 665.00 m
Surface Hole Latitude: 53.614887
Surface Hole Longitude: -111.773593

For data sources see[1][2]

Well History

Date Event
2005-06-02 Obtained License
2005-06-11 Surface Casing Operation Performed
2005-06-12 Direction Drilling Operation Performed - Deviate
2005-06-13 Finished Drilling
2005-06-13 Well Log Performed
2005-06-13 Well Mode changed to Drilled and Cased
2005-06-14 Production Casing Operation Performed
2005-06-14 Rig Released
2005-07-12 Perforation Treatment Performed - Jet Perforation
2005-07-18 Perforation Treatment Performed - Remedial Casing
2005-07-20 Perforation Treatment Performed - Jet Perforation
2005-07-21 Perforation Treatment Performed - Jet Perforation
2005-08-06 Perforation Treatment Performed - Jet Perforation
2005-12-02 Perforation Treatment Performed - Jet Perforation
2005-12-04 Perforation Treatment Performed - Cement Squeeze
2005-12-07 Perforation Treatment Performed - Cement Squeeze
2005-12-11 Perforation Treatment Performed - Jet Perforation
2005-12-14 Well Began Production
2005-12-14 Well Fluid changed to Gas
2005-12-14 Well Mode changed to Flowing
2006-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-23 Plug Back Performed
2006-09-24 Perforation Treatment Performed - Jet Perforation
2008-05-21 Well Fluid changed to Gas
2008-05-21 Well Mode changed to Suspended
2013-07-09 Well Fluid changed to Gas
2013-07-09 Well Mode changed to Closed
2013-09-18 Well Fluid changed to Gas
2013-09-18 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-06-12 400.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-12 Perforation 404.00 405.00 17
2006-09-23 Packing Device Capped w/Cement 617.00 625.00 0
2006-09-24 Perforation 579.00 581.00 17
2005-07-18 Remedial Casing Cementing 404.00 405.00 0
2005-07-20 Perforation 630.20 630.70 17
2005-07-21 Perforation 584.50 586.00 17
2005-08-06 Perforation 537.00 539.00 17
2005-12-02 Perforation 492.00 494.00 17
2005-12-04 Cement Squeeze 492.00 494.00 0
2005-12-07 Cement Squeeze 584.50 586.00 0
2005-12-11 Perforation 630.20 630.70 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3267 0.0 0.0 0.0
2007 77 0.0 0.0 0.0

For data sources see[6]

References