X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534131007000

Well Details

Well ID: 0534131007000
Loading map...
Location: 00/07-10-053-13W4/0
Location Alias: 00/07-10-53-13 W4M
Location Alias 2: 00/07-10-053-13 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 13
Section: 10
County/Municipality: County of Minburn No. 27
Well Name: PROVIDENT PLAIN LAKE 7-10-53-13
Operator Name: Canadian Natural Resources Limited
License Number: 0035258
License Date: 1968-11-22
License Status: RecCertified
Spud Date: 1968-11-26
Final Drill Date: 1968-11-30
Well Total Depth: 742.20 m
Surface Hole Latitude: 53.560505
Surface Hole Longitude: -111.827667

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-11-22 Obtained License
1968-11-30 Drill Stem Test Performed
1968-11-30 Finished Drilling
1968-12-01 Drill Stem Test Performed
1968-12-02 Production Casing Operation Performed
1968-12-02 Well Mode changed to Drilled and Cased
1970-05-13 Perforation Treatment Performed - Jet Perforation
1970-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-01 Well Began Production
1970-11-01 Well Fluid changed to Gas
1970-11-01 Well Mode changed to Flowing
1976-01-13 Perforation Treatment Performed - Fractured
1983-09-15 Well Log Performed
1985-02-28 Well Fluid changed to Gas
1985-02-28 Well Mode changed to Suspended
1985-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-28 Perforation Treatment Performed - Jet Perforation
1985-08-28 Plug Back Performed
1985-08-28 Well Fluid changed to Gas
1985-08-28 Well Mode changed to Abandoned Zone
1990-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-30 Plug Back Performed
1990-08-30 Well Abandoned
1990-08-30 Well Log Performed
1990-10-09 Perforation Treatment Performed - Jet Perforation
1990-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-10 Perforation Treatment Performed - Jet Perforation
1990-10-10 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-05-13 Perforation 600.20 604.10 13
1990-10-10 Perforation 429.00 430.00 13
1990-10-10 Packing Device Capped w/Cement 417.70 425.70 0
1990-10-10 Perforation 188.00 189.00 13
1990-10-10 Remedial Casing Cementing 188.00 189.00 0
1970-05-13 Perforation 594.40 595.60 13
1970-05-13 Perforation 596.20 597.10 13
1970-05-17 Acid Treatment 594.40 604.10 0
1976-01-13 Fracture 594.40 604.10 0
1985-08-28 Packing Device Capped w/Cement 582.00 590.00 0
1985-08-28 Perforation 555.00 556.00 13
1990-08-30 Packing Device Capped w/Cement 542.00 550.00 0
1990-10-09 Perforation 418.00 419.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 1159 0.0 0.0 0.0
1971 6477 0.0 0.0 0.0
1973 6007 0.0 0.0 0.0
1974 8081 0.0 0.0 0.0
1975 8605 0.0 0.0 0.0
1976 5013 0.0 0.0 0.0
1977 6363 0.0 0.0 0.0
1978 3978 0.0 0.0 0.0
1979 7599 0.0 0.0 0.0
1980 2169 0.0 0.0 0.0
1983 24 0.0 0.0 0.0

For data sources see[5]

References