X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534120306000

Well Details

Well ID: 0534120306000
Loading map...
Location: 00/06-03-053-12W4/0
Location Alias: 00/06-03-53-12 W4M
Location Alias 2: 00/06-03-053-12 W4/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 12
Section: 03
County/Municipality: County of Minburn No. 27
Well Name: PINE CLIFF PLAIN 6-3-53-12
Operator Name: Pine Cliff Energy Ltd.
License Number: 0047966
License Date: 1973-11-08
License Status: Issued
Spud Date: 1973-11-15
Final Drill Date: 1973-11-17
Well Total Depth: 768.10 m
Surface Hole Latitude: 53.545915
Surface Hole Longitude: -111.691370

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-11-08 Obtained License
1973-11-17 Finished Drilling
1973-11-17 Well Mode changed to Drilled and Cased
1973-11-18 Production Casing Operation Performed
1973-12-12 Perforation Treatment Performed - Jet Perforation
1973-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-16 Perforation Treatment Performed - Cement Squeeze
1973-12-18 Perforation Treatment Performed - Jet Perforation
1973-12-19 Perforation Treatment Performed - Jet Perforation
1973-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-02-23 Well Began Production
1974-02-23 Well Fluid changed to Gas
1974-02-23 Well Mode changed to Flowing
1974-03-01 Well Fluid changed to Gas
1974-03-01 Well Mode changed to Flowing
1976-02-20 Perforation Treatment Performed - Jet Perforation
1976-02-22 Perforation Treatment Performed - Acid Wash - No Pressure
1978-05-01 Well Fluid changed to Gas
1978-05-01 Well Mode changed to Suspended
1982-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-04 Well Fluid changed to Gas
1982-09-04 Well Mode changed to Abandoned Zone
2003-03-19 Perforation Treatment Performed - Jet Perforation
2003-03-19 Well Log Performed
2003-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-20 Perforation Treatment Performed - Jet Perforation
2003-03-20 Plug Back Performed
2003-03-20 Well Log Performed
2010-09-14 Perforation Treatment Performed - Jet Perforation
2010-09-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-12-12 Perforation 689.80 692.80 7
1982-09-04 Packing Device Capped w/Cement 711.30 719.30 0
2003-03-19 Perforation 663.90 665.70 20
2003-03-20 Packing Device Capped w/Cement 652.00 660.00 0
2003-03-20 Perforation 637.00 640.00 20
2010-09-14 Perforation 637.00 640.00 20
1973-12-12 Perforation 683.70 684.90 7
1973-12-13 Acid Treatment 683.70 692.80 0
1973-12-16 Cement Squeeze 683.70 692.80 0
1973-12-18 Perforation 663.90 665.70 7
1973-12-19 Perforation 722.70 724.20 7
1973-12-20 Acid Treatment 663.90 724.20 0
1976-02-20 Perforation 677.90 679.70 7
1976-02-22 Acid Wash 677.90 679.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 6678 0.0 0.0 0.0
1975 8663 0.0 0.0 0.0
1976 8405 0.0 0.0 0.0
1977 8488 0.0 0.0 0.0
1978 1730 0.0 0.0 0.0

For data sources see[5]

References