X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525211813020

Well Details

Well ID: 0525211813020
Loading map...
Location: 02/13-18-052-21W5/0
Location Alias: 02/13-18-52-21 W5M
Location Alias 2: 02/13-18-052-21 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 21
Section: 18
County/Municipality: Yellowhead County
Well Name: SDEL HZ ET AL MEDLOD 13-18-52-21
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0444398
License Date: 2012-02-23
License Status: Amended
Spud Date: 2012-04-10
Final Drill Date: 2012-05-02
Well Total Depth: 3843.00 m
Surface Hole Latitude: 53.490887
Surface Hole Longitude: -117.070876

For data sources see[1][2]

Well History

Date Event
2012-02-23 Obtained License
2012-04-10 Well Log Performed
2012-04-12 Surface Casing Operation Performed
2012-04-14 Lost Circulation Occurred
2012-04-16 Direction Drilling Operation Performed - Deviate
2012-04-19 Direction Drilling Operation Performed - Horizontal
2012-05-02 Finished Drilling
2012-05-02 Well Log Performed
2012-05-02 Well Mode changed to Drilled and Cased
2012-05-05 Production Casing Operation Performed
2012-05-06 Rig Released
2012-07-30 Well Log Performed
2012-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-08 Perforation Treatment Performed - Open-Hole Completion
2012-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-05 Well Began Production
2012-09-05 Well Fluid changed to Gas
2012-09-05 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-04-16 2020.00 Deviate (5 - 79 degrees)
2012-04-19 2517.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-08 Open Hole/Barefoot Completion 3837.00 3843.00 0
2012-08-09 Multi-Stage Fracture 3029.70 3029.80 0
2012-08-09 Multi-Stage Fracture 2930.40 2930.50 0
2012-08-09 Multi-Stage Fracture 2831.50 2831.60 0
2012-08-09 Multi-Stage Fracture 2730.50 2730.60 0
2012-08-08 Multi-Stage Fracture 3814.20 3814.30 0
2012-08-08 Multi-Stage Fracture 3731.30 3731.40 0
2012-08-08 Multi-Stage Fracture 3630.40 3630.50 0
2012-08-08 Multi-Stage Fracture 3527.60 3527.70 0
2012-08-08 Multi-Stage Fracture 3427.50 3427.60 0
2012-08-08 Multi-Stage Fracture 3327.60 3327.70 0
2012-08-08 Multi-Stage Fracture 3227.90 3228.00 0
2012-08-08 Multi-Stage Fracture 3129.60 3129.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2773 0.0 0.0 0.0
2013 8619 0.0 0.0 0.0
2014 8103 0.0 0.0 0.0
2015 7688 0.0 0.0 0.0
2016 4263 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-14 Lost Circulation 1365.00 1377.00
2012-08-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References