X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525210809000

Well Details

Well ID: 0525210809000
Loading map...
Location: 00/09-08-052-21W5/0
Location Alias: 00/09-08-52-21 W5M
Location Alias 2: 00/09-08-052-21 W5/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 21
Section: 08
County/Municipality: Yellowhead County
Well Name: SDEL HZ MEDLOD 9-8-52-21
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0444399
License Date: 2012-02-23
License Status: Amended
Spud Date: 2012-05-19
Final Drill Date: 2012-06-08
Well Total Depth: 4234.00 m
Surface Hole Latitude: 53.491067
Surface Hole Longitude: -117.070876

For data sources see[1][2]

Well History

Date Event
2012-02-23 Obtained License
2012-05-19 Well Log Performed
2012-05-21 Surface Casing Operation Performed
2012-05-27 Direction Drilling Operation Performed - Deviate
2012-05-29 Direction Drilling Operation Performed - Horizontal
2012-06-08 Finished Drilling
2012-06-08 Well Log Performed
2012-06-08 Well Mode changed to Drilled and Cased
2012-06-12 Production Casing Operation Performed
2012-06-12 Rig Released
2012-07-31 Well Log Performed
2012-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-10 Perforation Treatment Performed - Open-Hole Completion
2012-09-09 Well Began Production
2012-09-09 Well Fluid changed to Gas
2012-09-09 Well Mode changed to Flowing
2014-07-20 Well Fluid changed to Gas
2014-07-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-19 Savanna Drilling Corp. 614 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-27 2130.00 Deviate (5 - 79 degrees)
2012-05-29 2500.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-10 Open Hole/Barefoot Completion 4230.00 4234.00 0
2012-08-10 Multi-Stage Fracture 3182.10 3182.20 0
2012-08-10 Multi-Stage Fracture 3056.70 3056.80 0
2012-08-10 Multi-Stage Fracture 2921.90 2922.00 0
2012-08-10 Multi-Stage Fracture 2796.90 2797.00 0
2012-08-10 Multi-Stage Fracture 2669.90 2670.00 0
2012-08-10 Multi-Stage Fracture 4204.80 4204.90 0
2012-08-10 Multi-Stage Fracture 4138.00 4138.10 0
2012-08-10 Multi-Stage Fracture 4050.70 4050.80 0
2012-08-10 Multi-Stage Fracture 3810.90 3811.00 0
2012-08-10 Multi-Stage Fracture 3711.00 3711.10 0
2012-08-10 Multi-Stage Fracture 3571.80 3571.90 0
2012-08-10 Multi-Stage Fracture 3458.60 3458.70 0
2012-08-10 Multi-Stage Fracture 3318.00 3318.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2648 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8277 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 4583 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-12 No Incident Encountered 0.00 0.00
2012-08-21 No Incident Encountered 0.00 0.00

For data sources see[8]

References