X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0525131310002

Well Details

Well ID: 0525131310002
Loading map...
Location: 00/10-13-052-13W5/2
Location Alias: 00/10-13-52-13 W5M
Location Alias 2: 00/10-13-052-13 W5/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 5
Range: 13
Section: 13
County/Municipality: Yellowhead County
Well Name: WELLORE ET AL CARROT 10-13-52-13
Operator Name: Enerplus Corporation
License Number: 0024873
License Date: 1963-09-26
License Status: RecCertified
Spud Date: 1985-03-04
Final Drill Date: 1985-03-05
Well Total Depth: 1703.80 m
Surface Hole Latitude: 53.492111
Surface Hole Longitude: -115.779028

For data sources see[1][2]

Well History

Date Event
1963-09-26 Obtained License
1985-03-05 Finished Drilling
1985-03-05 Perforation Treatment Performed - Jet Perforation
1985-03-05 Well Mode changed to Drilled and Cased
1985-03-13 Rig Released
1985-03-14 Well Began Production
1985-03-14 Well Fluid changed to Crude Oil
1985-03-14 Well Mode changed to Flowing
1985-04-01 Well Fluid changed to Crude Oil
1985-04-01 Well Mode changed to Suspended
1988-06-04 Perforation Treatment Performed - Fractured
1988-06-20 Well Fluid changed to Crude Oil
1988-06-20 Well Mode changed to Flowing
1988-09-01 Well Fluid changed to Crude Oil
1988-09-01 Well Mode changed to Suspended
1991-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-26 Perforation Treatment Performed - Jet Perforation
1991-09-26 Plug Back Performed
1991-09-27 Perforation Treatment Performed - Remedial Casing
1991-09-27 Well Fluid changed to Crude Oil
1991-09-27 Well Mode changed to Abandoned
1991-09-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-05 Perforation 1646.80 1648.10 3
1988-06-04 Fracture 1646.80 1648.10 0
1991-09-26 Packing Device Capped w/Cement 1627.00 1635.00 0
1991-09-26 Perforation 400.00 402.00 13
1991-09-27 Remedial Casing Cementing 400.00 402.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 24 0.0 0.0 0.0
1988 1443 0.0 0.0 0.0

For data sources see[5]

References