X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263608000

Well Details

Well ID: 0524263608000
Loading map...
Location: 00/08-36-052-26W4/0
Location Alias: 00/08-36-52-26 W4M
Location Alias 2: 00/08-36-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 36
County/Municipality: Edmonton
Well Name: CASE ACHESON 8-36-52-26
Operator Name: Obsidian Energy Ltd.
License Number: 0087935
License Date: 1980-12-31
License Status: RecCertified
Spud Date: 1981-01-16
Final Drill Date: 1981-01-23
Well Total Depth: 1305.00 m
Surface Hole Latitude: 53.532746
Surface Hole Longitude: -113.690931

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-31 Obtained License
1981-01-23 Finished Drilling
1981-01-23 Well Mode changed to Drilled and Cased
1981-01-24 Drill Stem Test Performed
1981-01-25 Drill Stem Test Performed
1981-01-27 Production Casing Operation Performed
1981-02-24 Perforation Treatment Performed - Jet Perforation
1981-03-01 Well Began Production
1981-03-01 Well Fluid changed to Crude Oil
1981-03-01 Well Mode changed to Flowing
1985-04-15 Perforation Treatment Performed - Jet Perforation
2000-01-19 Well Fluid changed to Crude Oil
2000-01-19 Well Mode changed to Closed
2000-08-05 Well Fluid changed to Crude Oil
2000-08-05 Well Mode changed to Pumping
2005-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-30 Plug Back Performed
2005-08-30 Well Fluid changed to Crude Oil
2005-08-30 Well Mode changed to Abandoned Zone
2005-08-31 Perforation Treatment Performed - Jet Perforation
2005-08-31 Perforation Treatment Performed - Remedial Casing
2006-12-18 Well Abandoned
2006-12-18 Well Fluid changed to Crude Oil
2006-12-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-24 Perforation 1233.00 1235.00 13
1985-04-15 Perforation 1233.50 1235.50 14
2005-08-30 Packing Device Capped w/Cement 1217.00 1225.00 0
2005-08-31 Perforation 460.00 461.00 13
2005-08-31 Remedial Casing Cementing 460.00 461.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 6176 0.0 0.0 0.0
1982 6712 0.0 0.0 0.0
1983 8310 0.0 0.0 0.0
1984 8399 0.0 0.0 0.0
1985 8632 0.0 0.0 0.0
1986 8711 0.0 0.0 0.0
1987 8699 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 8655 0.0 0.0 0.0
1990 8603 0.0 0.0 0.0
1991 8723 0.0 0.0 0.0
1992 8779 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8609 0.0 0.0 0.0
1995 8485 0.0 0.0 0.0
1996 8649 0.0 0.0 0.0
1997 8562 0.0 0.0 0.0
1998 8127 0.0 0.0 0.0
1999 8731 0.0 0.0 0.0
2000 3963 0.0 0.0 0.0
2001 8719 0.0 0.0 0.0
2002 8601 0.0 0.0 0.0
2003 8577 0.0 0.0 0.0
2004 188 0.0 0.0 0.0

For data sources see[5]

References