X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524263407003

Well Details

Well ID: 0524263407003
Loading map...
Location: 00/07-34-052-26W4/3
Location Alias: 00/07-34-52-26 W4M
Location Alias 2: 00/07-34-052-26 W4/03
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 34
County/Municipality: Parkland County
Well Name: CHEVRON WELBOURN ACHESON 7-34-52-26
Operator Name: Chevron Canada Limited
License Number: 0004219
License Date: 1952-02-14
License Status: RecCertified
Spud Date: 1952-02-14
Final Drill Date: 1952-03-10
Well Total Depth: 1563.30 m
Surface Hole Latitude: 53.532268
Surface Hole Longitude: -113.746553

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-14 Obtained License
1952-03-07 Production Casing Operation Performed
1952-03-10 Finished Drilling
1952-03-10 Perforation Treatment Performed - Open-Hole Completion
1952-03-10 Well Mode changed to Drilled and Cased
1988-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-24 Plug Back Performed
1988-03-24 Well Log Performed
1988-03-25 Perforation Treatment Performed - Jet Perforation
1988-04-04 Well Log Performed
1995-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-24 Perforation Treatment Performed - Jet Perforation
1995-01-24 Plug Back Performed
1995-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-01 Perforation Treatment Performed - Remedial Casing
1995-02-02 Perforation Treatment Performed - Chemical Squeeze
1995-02-02 Perforation Treatment Performed - Jet Perforation
1995-02-04 Perforation Treatment Performed - Remedial Casing
1995-02-07 Perforation Treatment Performed - Jet Perforation
1995-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-10 Perforation Treatment Performed - Jet Perforation
1995-02-12 Perforation Treatment Performed - Fractured
1995-02-26 Well Began Production
1995-02-26 Well Fluid changed to Crude Oil
1995-02-26 Well Mode changed to Flowing
1996-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-29 Plug Back Performed
1996-02-29 Well Fluid changed to Crude Oil
1996-02-29 Well Mode changed to Abandoned
1996-03-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-10 Open Hole/Barefoot Completion 1559.40 1563.30 0
1995-02-02 Chemical Squeeze 189.00 189.00 0
1995-02-04 Remedial Casing Cementing 189.00 189.00 0
1995-02-07 Perforation 1247.50 1250.00 14
1995-02-08 Acid Treatment 1247.50 1250.00 0
1995-02-10 Perforation 1242.50 1244.00 18
1995-02-12 Fracture 1242.50 1250.00 0
1996-02-29 Packing Device Capped w/Cement 1096.00 1104.00 0
1988-03-24 Packing Device Capped w/Cement 1544.60 1552.60 0
1988-03-25 Perforation 1327.00 1329.20 13
1988-03-25 Perforation 1336.40 1338.50 13
1995-01-24 Packing Device Capped w/Cement 1292.00 1300.00 0
1995-01-24 Perforation 280.00 280.00 7
1995-02-01 Acid Treatment 280.00 280.00 0
1995-02-01 Remedial Casing Cementing 280.00 280.00 0
1995-02-02 Perforation 189.00 189.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 953 0.0 0.0 0.0

For data sources see[5]

References