X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524262210002

Well Details

Well ID: 0524262210002
Loading map...
Location: 00/10-22-052-26W4/2
Location Alias: 00/10-22-52-26 W4M
Location Alias 2: 00/10-22-052-26 W4/02
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 22
County/Municipality: Stony Plain 135
Well Name: CHEVRON ACHESON 10-22-52-26
Operator Name: Chevron Canada Limited
License Number: 0004567
License Date: 1952-04-25
License Status: RecExempt
Spud Date: 1952-05-02
Final Drill Date: 1952-05-27
Well Total Depth: 1557.20 m
Surface Hole Latitude: 53.506652
Surface Hole Longitude: -113.746502

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-04-25 Obtained License
1952-05-12 Drill Stem Test Performed
1952-05-13 Drill Stem Test Performed
1952-05-14 Drill Stem Test Performed
1952-05-18 Drill Stem Test Performed
1952-05-22 Drill Stem Test Performed
1952-05-22 Liner Casing Operation Performed
1952-05-27 Finished Drilling
1952-05-27 Well Mode changed to Drilled and Cased
1952-05-31 Perforation Treatment Performed - Bullet Perforation
1952-06-01 Perforation Treatment Performed - Acid Wash - No Pressure
1952-08-27 Perforation Treatment Performed - Jet Perforation
1952-09-04 Perforation Treatment Performed - Cement Squeeze
1984-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-08-08 Plug Back Performed
1984-08-08 Well Log Performed
1984-08-09 Perforation Treatment Performed - Jet Perforation
1984-08-09 Well Log Performed
1984-08-10 Perforation Treatment Performed - Acid Wash - No Pressure
1984-08-13 Perforation Treatment Performed - Acid Wash - No Pressure
1984-08-13 Perforation Treatment Performed - Jet Perforation
1984-08-13 Well Log Performed
1984-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-27 Well Began Production
1984-08-27 Well Fluid changed to Crude Oil
1984-08-27 Well Mode changed to Pumping
1989-11-20 Well Fluid changed to Crude Oil
1989-11-20 Well Mode changed to Suspended
1996-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-10 Plug Back Performed
1996-09-14 Well Log Performed
1996-09-17 Perforation Treatment Performed - Jet Perforation
1996-09-21 Perforation Treatment Performed - Remedial Casing
1996-09-27 Well Abandoned
1996-09-27 Well Fluid changed to Crude Oil
1996-09-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-05-31 Bullet Perforation 1549.60 1554.50 13
1984-08-15 Acid Treatment 1248.50 1249.00 0
1996-09-10 Packing Device Capped w/Cement 1233.00 1241.00 0
1996-09-17 Perforation 232.60 233.60 14
1996-09-21 Remedial Casing Cementing 232.60 233.60 0
1952-06-01 Acid Wash 1549.60 1554.50 0
1952-08-27 Perforation 1463.00 1463.30 13
1952-09-04 Cement Squeeze 1463.00 1463.30 0
1984-08-08 Packing Device Capped w/Cement 1536.30 1547.00 0
1984-08-09 Perforation 1248.50 1249.00 10
1984-08-10 Acid Wash 1248.50 1249.00 0
1984-08-13 Perforation 1248.50 1249.00 10
1984-08-13 Acid Wash 1248.50 1249.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2924 0.0 0.0 0.0
1985 7971 0.0 0.0 0.0
1986 5007 0.0 0.0 0.0
1987 1930 0.0 0.0 0.0
1988 5838 0.0 0.0 0.0
1989 3583 0.0 0.0 0.0

For data sources see[5]

References