X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524130611000

Well Details

Well ID: 0524130611000
Loading map...
Location: 00/11-06-052-13W4/0
Location Alias: 00/11-06-52-13 W4M
Location Alias 2: 00/11-06-052-13 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 13
Section: 06
County/Municipality: County of Minburn No. 27
Well Name: OMERS ENERGY WARWICK 11-6-52-13
Operator Name: AlphaBow Energy Ltd.
License Number: 0045890
License Date: 1973-05-24
License Status: Suspension
Spud Date: 1973-05-30
Final Drill Date: 1973-06-02
Well Total Depth: 787.90 m
Surface Hole Latitude: 53.464119
Surface Hole Longitude: -111.911091

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-05-24 Obtained License
1973-06-02 Finished Drilling
1973-06-03 Drill Stem Test Performed
1973-06-04 Production Casing Operation Performed
1973-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-13 Perforation Treatment Performed - Jet Perforation
1973-06-22 Perforation Treatment Performed - Cement Squeeze
1973-06-24 Perforation Treatment Performed - Jet Perforation
1973-06-24 Well Mode changed to Drilled and Cased
1973-12-19 Well Began Production
1973-12-19 Well Fluid changed to Gas
1973-12-19 Well Mode changed to Flowing
1980-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-02 Perforation Treatment Performed - Jet Perforation
1980-10-02 Well Fluid changed to Gas
1980-10-02 Well Mode changed to Abandoned Zone
1980-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-21 Perforation Treatment Performed - Jet Perforation
1999-11-10 Perforation Treatment Performed - Jet Perforation
1999-11-15 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-06-13 Perforation 749.50 751.60 7
1980-10-03 Acid Treatment 612.30 620.30 0
1981-05-27 Acid Treatment 612.30 620.30 0
1999-10-21 Perforation 654.10 655.10 20
1999-11-10 Perforation 619.60 621.50 13
1999-11-10 Perforation 654.10 655.30 13
1999-11-15 Fracture 654.10 655.30 0
1973-06-13 Perforation 754.10 755.00 7
1973-06-13 Acid Treatment 749.50 755.00 0
1973-06-22 Cement Squeeze 749.50 755.00 0
1973-06-24 Perforation 754.10 755.00 7
1980-10-02 Packing Device Capped w/Cement 731.00 739.00 0
1980-10-02 Perforation 612.30 615.40 13
1980-10-02 Perforation 615.70 617.20 13
1980-10-02 Perforation 620.00 620.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 312 0.0 0.0 0.0
1974 6587 0.0 0.0 0.0
1975 690 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References