X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0524090402000

Well Details

Well ID: 0524090402000
Loading map...
Location: 00/02-04-052-09W4/0
Location Alias: 00/02-04-52-09 W4M
Location Alias 2: 00/02-04-052-09 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 09
Section: 04
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 2-4-52-9
Operator Name: Perpetual Operating Corp.
License Number: 0162745
License Date: 1993-12-02
License Status: Abandoned
Spud Date: 1993-12-07
Final Drill Date: 1993-12-10
Well Total Depth: 749.00 m
Surface Hole Latitude: 53.457880
Surface Hole Longitude: -111.262762

For data sources see[1][2]

Well History

Date Event
1993-12-02 Obtained License
1993-12-08 Surface Casing Operation Performed
1993-12-10 Finished Drilling
1993-12-10 Kick Occurred
1993-12-10 Lost Circulation Occurred
1993-12-10 Well Mode changed to Drilled and Cased
1993-12-11 Well Log Performed
1993-12-12 Production Casing Operation Performed
1993-12-13 Rig Released
1994-01-19 Perforation Treatment Performed - Jet Perforation
1994-01-19 Well Log Performed
1994-01-20 Perforation Treatment Performed - Jet Perforation
1994-01-20 Well Log Performed
1994-02-13 Well Began Production
1994-02-13 Well Fluid changed to Gas
1994-02-13 Well Mode changed to Flowing
1994-04-30 Well Fluid changed to Gas
1994-04-30 Well Mode changed to Suspended
1994-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-09 Perforation Treatment Performed - Jet Perforation
1994-05-09 Plug Back Performed
1994-05-09 Well Fluid changed to Gas
1994-05-09 Well Mode changed to Abandoned Zone
1999-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-28 Perforation Treatment Performed - Jet Perforation
1999-02-28 Plug Back Performed
1999-02-28 Well Log Performed
1999-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-08 Perforation Treatment Performed - Jet Perforation
1999-08-08 Plug Back Performed
2003-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-18 Plug Back Performed
2003-01-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-01-19 Perforation 690.50 691.20 13
1999-08-08 Perforation 529.00 531.00 20
2003-01-18 Packing Device Capped w/Cement 515.90 524.90 0
1994-01-20 Perforation 640.00 641.00 13
1994-05-09 Packing Device Capped w/Cement 659.00 667.00 0
1994-05-09 Perforation 573.50 574.50 13
1999-02-28 Packing Device Capped w/Cement 637.50 638.50 0
1999-02-28 Perforation 632.00 633.20 20
1999-08-08 Packing Device Capped w/Cement 622.00 630.00 0
1999-08-08 Packing Device Capped w/Cement 564.00 572.00 0
1999-08-08 Perforation 532.50 533.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 430 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-12-10 Lost Circulation 747.00 749.00
1993-12-10 Kick 749.00 749.00

For data sources see[6]

References