If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515121103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.396511,"lon":-115.669548,"icon":""}]} |
Location: 00/03-11-051-12W5/0 | |
Location Alias: 00/03-11-51-12 W5M | |
Location Alias 2: 00/03-11-051-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 12 | |
Section: 11 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION HZ PEMBINA 3-11-51-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0424695 | |
License Date: 2010-10-18 | |
License Status: Issued | |
Spud Date: 2010-11-30 | |
Final Drill Date: 2010-12-20 | |
Well Total Depth: 3475.00 m | |
Surface Hole Latitude: 53.396511 | |
Surface Hole Longitude: -115.669548 |
Date | Event |
---|---|
2010-10-18 | Obtained License |
2010-12-04 | Surface Casing Operation Performed |
2010-12-07 | Direction Drilling Operation Performed - Horizontal |
2010-12-20 | Finished Drilling |
2010-12-20 | Well Mode changed to Drilled and Cased |
2010-12-22 | Production Casing Operation Performed |
2010-12-23 | Rig Released |
2011-01-07 | Well Log Performed |
2011-01-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-01-11 | Perforation Treatment Performed - Open-Hole Completion |
2011-02-21 | Well Began Production |
2011-02-21 | Well Fluid changed to Crude Oil |
2011-02-21 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-07 | 1399.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-09 | Multi-Stage Fracture | 3436.20 | 3436.30 | 0 |
2011-01-09 | Multi-Stage Fracture | 2545.60 | 2545.70 | 0 |
2011-01-09 | Multi-Stage Fracture | 2447.70 | 2447.80 | 0 |
2011-01-09 | Multi-Stage Fracture | 2334.30 | 2334.40 | 0 |
2011-01-09 | Multi-Stage Fracture | 2234.30 | 2234.40 | 0 |
2011-01-09 | Multi-Stage Fracture | 2134.30 | 2134.40 | 0 |
2011-01-11 | Open Hole/Barefoot Completion | 3472.00 | 3475.00 | 0 |
2011-01-09 | Multi-Stage Fracture | 3333.60 | 3333.70 | 0 |
2011-01-09 | Multi-Stage Fracture | 3233.60 | 3233.70 | 0 |
2011-01-09 | Multi-Stage Fracture | 3133.80 | 3133.90 | 0 |
2011-01-09 | Multi-Stage Fracture | 3048.30 | 3048.40 | 0 |
2011-01-09 | Multi-Stage Fracture | 2949.40 | 2949.50 | 0 |
2011-01-09 | Multi-Stage Fracture | 2863.80 | 2863.90 | 0 |
2011-01-09 | Multi-Stage Fracture | 2764.80 | 2764.90 | 0 |
2011-01-09 | Multi-Stage Fracture | 2657.40 | 2657.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7378 | 0.0 | 0.0 | 0.0 |
2012 | 8753 | 0.0 | 0.0 | 0.0 |
2013 | 8530 | 0.0 | 0.0 | 0.0 |
2014 | 8510 | 0.0 | 0.0 | 0.0 |
2015 | 8716 | 0.0 | 0.0 | 0.0 |
2016 | 8627 | 0.0 | 0.0 | 0.0 |
2017 | 7546 | 0.0 | 0.0 | 0.0 |
2018 | 8591 | 0.0 | 0.0 | 0.0 |
2019 | 8265 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[6]