0515120701000

Well Details

Well ID: 0515120701000
Loading map...
Location: 00/01-07-051-12W5/0
Location Alias: 00/01-07-51-12 W5M
Location Alias 2: 00/01-07-051-12 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 12
Section: 07
County/Municipality: Yellowhead County
Well Name: VERMILION HZ PEMBINA 1-7-51-12
Operator Name: Vermilion Energy Inc.
License Number: 0449998
License Date: 2012-11-13
License Status: Issued
Spud Date: 2012-12-13
Final Drill Date: 2012-12-20
Well Total Depth: 3450.00 m
Surface Hole Latitude: 53.384670
Surface Hole Longitude: -115.773622

For data sources see[1][2]

Well History

Date Event
2012-11-13 Obtained License
2012-12-14 Surface Casing Operation Performed
2012-12-15 Well Log Performed
2012-12-16 Direction Drilling Operation Performed - Deviate
2012-12-17 Direction Drilling Operation Performed - Horizontal
2012-12-20 Finished Drilling
2012-12-20 Well Mode changed to Drilled and Cased
2012-12-26 Production Casing Operation Performed
2012-12-27 Rig Released
2013-02-01 Well Began Production
2013-02-01 Well Fluid changed to Crude Oil
2013-02-01 Well Mode changed to Pumping
2013-02-05 Well Log Performed
2013-02-21 Perforation Treatment Performed - Open-Hole Completion
2013-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-23 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-13 Ironhand Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-16 1350.00 Deviate (5 - 79 degrees)
2012-12-17 2064.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-21 Open Hole/Barefoot Completion 3339.50 3450.00 0
2013-02-23 Multi-Stage Fracture 2691.50 2691.60 0
2013-02-23 Multi-Stage Fracture 2606.00 2606.10 0
2013-02-23 Multi-Stage Fracture 2520.80 2520.90 0
2013-02-23 Multi-Stage Fracture 2435.30 2435.40 0
2013-02-23 Multi-Stage Fracture 2349.90 2350.00 0
2013-02-23 Multi-Stage Fracture 2264.50 2264.60 0
2013-02-23 Multi-Stage Fracture 2179.10 2179.20 0
2013-02-23 Multi-Stage Fracture 2107.00 2107.10 0
2013-02-22 Multi-Stage Fracture 3335.10 3335.20 0
2013-02-22 Multi-Stage Fracture 3289.10 3289.20 0
2013-02-22 Multi-Stage Fracture 3203.70 3203.80 0
2013-02-22 Multi-Stage Fracture 3118.30 3118.40 0
2013-02-22 Multi-Stage Fracture 3033.00 3033.10 0
2013-02-22 Multi-Stage Fracture 2947.60 2947.70 0
2013-02-22 Multi-Stage Fracture 2862.30 2862.40 0
2013-02-23 Multi-Stage Fracture 2776.90 2777.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-22 2013-02-23 1,824 1,639 N/A
2 2013-02-23 2013-02-23 1,824 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 4.0831 N/A
water 7732-18-5 100 77.6843 N/A
Sand (20/40) Trican silica crystalline 14808-60-7 100 15.6857 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 0.8011 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.6995 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0097 N/A
dibromoacetonitrile 3252-43-5 100 0.0097 N/A
non-hazardous ingredients Not Available 100 0.0097 N/A
polyethylene glycol 25322-68-3 100 0.0097 N/A
sodium bromide 7647-15-6 100 0.0097 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0558 N/A
cured acrylic resin Not Available 100 0.0558 N/A
silica crystalline 14808-60-7 100 0.0558 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.0874 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1701 N/A
formic acid 64-18-6 100 0.1701 N/A
non-hazardous ingredients Not Available 100 0.1701 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.194 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.194 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0854 N/A
propylene glycol 57-55-6 100 0.0854 N/A
WG-111L Rapid Gellant Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.4419 N/A
polysaccharide blend Not Available 100 0.4419 N/A
2 GBE 1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0215 N/A
propylene glycol 57-55-6 100 0.0215 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-10 2013-02-17 Surface Water - Runoff 1803
2013-02-12 2013-02-12 Municipal Water 90

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6545 0.0 0.0 0.0
2014 8237 0.0 0.0 0.0
2015 8567 0.0 0.0 0.0
2016 8521 0.0 0.0 0.0
2017 8045 0.0 0.0 0.0
2018 8496 0.0 0.0 0.0
2019 8622 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-27 No Incident Encountered 0.00 0.00
2013-02-25 No Incident Encountered 0.00 0.00

For data sources see[10]