If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515120302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.371839,"lon":-115.645708,"icon":""}]} |
Location: 00/02-03-051-12W5/0 | |
Location Alias: 00/02-03-51-12 W5M | |
Location Alias 2: 00/02-03-051-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 12 | |
Section: 03 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION HZ PEMBINA 2-3-51-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0433591 | |
License Date: 2011-05-17 | |
License Status: Issued | |
Spud Date: 2011-07-05 | |
Final Drill Date: 2011-07-16 | |
Well Total Depth: 4240.00 m | |
Surface Hole Latitude: 53.371839 | |
Surface Hole Longitude: -115.645708 |
Date | Event |
---|---|
2011-05-17 | Obtained License |
2011-07-06 | Surface Casing Operation Performed |
2011-07-07 | Well Log Performed |
2011-07-08 | Direction Drilling Operation Performed - Horizontal |
2011-07-16 | Finished Drilling |
2011-07-16 | Well Mode changed to Drilled and Cased |
2011-07-19 | Production Casing Operation Performed |
2011-07-20 | Rig Released |
2011-09-14 | Well Log Performed |
2011-09-16 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-28 | Well Began Production |
2011-09-28 | Well Fluid changed to Crude Oil |
2011-09-28 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-07-08 | 1097.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-16 | Open Hole/Barefoot Completion | 4236.00 | 4240.00 | 0 |
2011-09-19 | Multi-Stage Fracture | 3399.40 | 3399.50 | 0 |
2011-09-19 | Multi-Stage Fracture | 3300.60 | 3300.70 | 0 |
2011-09-19 | Multi-Stage Fracture | 3215.00 | 3215.10 | 0 |
2011-09-19 | Multi-Stage Fracture | 3102.70 | 3102.80 | 0 |
2011-09-19 | Multi-Stage Fracture | 3017.20 | 3017.30 | 0 |
2011-09-19 | Multi-Stage Fracture | 2918.30 | 2918.40 | 0 |
2011-09-19 | Multi-Stage Fracture | 2819.40 | 2819.50 | 0 |
2011-09-19 | Multi-Stage Fracture | 2720.50 | 2720.60 | 0 |
2011-09-19 | Multi-Stage Fracture | 2621.60 | 2621.70 | 0 |
2011-09-19 | Multi-Stage Fracture | 2522.60 | 2522.70 | 0 |
2011-09-18 | Multi-Stage Fracture | 4197.60 | 4197.70 | 0 |
2011-09-19 | Multi-Stage Fracture | 2423.70 | 2423.80 | 0 |
2011-09-20 | Multi-Stage Fracture | 2324.80 | 2324.90 | 0 |
2011-09-23 | Multi-Stage Fracture | 2225.80 | 2225.90 | 0 |
2011-09-24 | Multi-Stage Fracture | 2140.30 | 2140.40 | 0 |
2011-09-18 | Multi-Stage Fracture | 4091.90 | 4092.00 | 0 |
2011-09-18 | Multi-Stage Fracture | 3992.90 | 3993.00 | 0 |
2011-09-18 | Multi-Stage Fracture | 3893.90 | 3894.00 | 0 |
2011-09-18 | Multi-Stage Fracture | 3795.10 | 3795.20 | 0 |
2011-09-18 | Multi-Stage Fracture | 3696.20 | 3696.30 | 0 |
2011-09-19 | Multi-Stage Fracture | 3597.30 | 3597.40 | 0 |
2011-09-19 | Multi-Stage Fracture | 3498.30 | 3498.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 955 | 0.0 | 0.0 | 0.0 |
2012 | 8430 | 0.0 | 0.0 | 0.0 |
2013 | 8353 | 0.0 | 0.0 | 0.0 |
2014 | 8696 | 0.0 | 0.0 | 0.0 |
2015 | 8754 | 0.0 | 0.0 | 0.0 |
2016 | 8293 | 0.0 | 0.0 | 0.0 |
2017 | 8062 | 0.0 | 0.0 | 0.0 |
2018 | 8689 | 0.0 | 0.0 | 0.0 |
2019 | 8732 | 0.0 | 0.0 | 0.0 |
2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[6]