X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272711000

Well Details

Well ID: 0514272711000
Loading map...
Location: 00/11-27-051-27W4/0
Location Alias: 00/11-27-51-27 W4M
Location Alias 2: 00/11-27-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 27
County/Municipality: Parkland County
Well Name: IMP GOLDEN SPIKE IN 11-27N-51-27
Operator Name: Imperial Oil Resources Limited
License Number: 0002189
License Date: 1950-10-21
License Status: Suspension
Spud Date: 1950-10-27
Final Drill Date: 1950-12-12
Well Total Depth: 1846.80 m
Surface Hole Latitude: 53.433778
Surface Hole Longitude: -113.900717

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-10-21 Obtained License
1950-11-09 Drill Stem Test Performed
1950-11-10 Drill Stem Test Performed
1950-11-17 Drill Stem Test Performed
1950-11-30 Drill Stem Test Performed
1950-12-02 Drill Stem Test Performed
1950-12-05 Production Casing Operation Performed
1950-12-11 Drill Stem Test Performed
1950-12-12 Finished Drilling
1950-12-12 Perforation Treatment Performed - Open-Hole Completion
1950-12-12 Well Mode changed to Drilled and Cased
1950-12-16 Perforation Treatment Performed - Acid Wash - No Pressure
1950-12-17 Well Began Production
1950-12-17 Well Fluid changed to Crude Oil
1950-12-17 Well Mode changed to Flowing
1964-04-25 Perforation Treatment Performed - Cement Plug
1964-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-04-27 Well Fluid changed to Crude Oil
1964-04-27 Well Mode changed to Abandoned Zone
1964-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-28 Perforation Treatment Performed - Jet Perforation
1964-04-29 Perforation Treatment Performed - Acid Wash - No Pressure
1964-04-30 Perforation Treatment Performed - Jet Perforation
1964-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-02 Perforation Treatment Performed - Acid Wash - No Pressure
1964-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-05 Perforation Treatment Performed - Jet Perforation
1964-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-07 Perforation Treatment Performed - Jet Perforation
1964-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-12 Perforation Treatment Performed - Cement Squeeze
1964-05-13 Perforation Treatment Performed - Cement Squeeze
1964-05-14 Perforation Treatment Performed - Cement Squeeze
1964-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-20 Perforation Treatment Performed - Cement Squeeze
1964-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-08 Perforation Treatment Performed - Jet Perforation
1966-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-10 Perforation Treatment Performed - Acid Wash - No Pressure
1966-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-14 Perforation Treatment Performed - Cement Squeeze
1967-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-29 Well Log Performed
1991-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-01 Perforation Treatment Performed - Cement Squeeze
2002-09-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-12-12 Open Hole/Barefoot Completion 1763.30 1846.80 0
1964-05-01 Acid Treatment 1405.10 1414.30 0
1964-05-02 Acid Wash 1391.10 1400.90 0
1964-05-04 Acid Treatment 1391.10 1400.90 0
1964-05-05 Perforation 1333.50 1339.90 3
1964-05-07 Acid Treatment 1333.50 1339.90 0
1964-05-07 Perforation 1251.20 1256.40 3
1964-05-09 Acid Treatment 1251.20 1256.40 0
1964-05-12 Cement Squeeze 1251.20 1256.40 0
1964-05-13 Cement Squeeze 1251.20 1256.40 0
1964-05-14 Cement Squeeze 1422.80 1427.10 0
1950-12-16 Acid Wash 1763.30 1846.80 0
1964-05-15 Acid Treatment 1391.10 1400.90 0
1964-05-20 Cement Squeeze 1422.80 1427.10 0
1964-09-16 Acid Treatment 1391.10 1400.90 0
1966-06-08 Perforation 1571.50 1573.10 7
1966-06-08 Perforation 1576.70 1579.80 7
1966-06-08 Perforation 1582.50 1587.10 7
1966-06-09 Acid Treatment 1571.50 1587.10 0
1966-06-10 Acid Wash 1571.50 1587.10 0
1966-06-13 Acid Treatment 1571.50 1587.10 0
1966-06-14 Cement Squeeze 1333.50 1339.90 0
1964-04-25 Cement Plug 1805.90 1846.80 0
1966-06-14 Cement Squeeze 1391.10 1400.90 0
1966-06-14 Cement Squeeze 1405.10 1414.30 0
1967-02-07 Acid Treatment 1571.50 1587.10 0
1973-06-01 Acid Treatment 1571.50 1587.10 0
1991-04-30 Acid Treatment 1391.10 1400.90 0
1991-05-01 Cement Squeeze 1391.10 1408.50 0
1964-04-27 Packing Device Capped w/Cement 1725.50 1755.60 0
1964-04-28 Perforation 1422.80 1427.10 7
1964-04-28 Acid Treatment 1422.80 1427.10 0
1964-04-29 Acid Wash 1422.80 1427.10 0
1964-04-30 Perforation 1405.10 1414.30 3
1964-04-30 Perforation 1391.10 1400.90 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References