X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272216000

Well Details

Well ID: 0514272216000
Loading map...
Location: 00/16-22-051-27W4/0
Location Alias: 00/16-22-51-27 W4M
Location Alias 2: 00/16-22-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 22
County/Municipality: Parkland County
Well Name: IMPERIAL GOLDEN SPIKE NO. 22
Operator Name: Imperial Oil Resources Limited
License Number: 0006763
License Date: 1953-07-17
License Status: Abandoned
Spud Date: 1953-09-06
Final Drill Date: 1953-10-15
Well Total Depth: 1586.80 m
Surface Hole Latitude: 53.422900
Surface Hole Longitude: -113.888747

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-17 Obtained License
1953-09-15 Drill Stem Test Performed
1953-09-16 Drill Stem Test Performed
1953-09-30 Drill Stem Test Performed
1953-10-01 Drill Stem Test Performed
1953-10-09 Drill Stem Test Performed
1953-10-10 Drill Stem Test Performed
1953-10-11 Drill Stem Test Performed
1953-10-12 Production Casing Operation Performed
1953-10-15 Finished Drilling
1953-10-15 Perforation Treatment Performed - Open-Hole Completion
1953-10-15 Well Mode changed to Drilled and Cased
1953-10-21 Well Began Production
1953-10-21 Well Fluid changed to Crude Oil
1953-10-21 Well Mode changed to Flowing
1954-01-09 Well Fluid changed to Crude Oil
1954-01-09 Well Mode changed to Pumping
1966-04-26 Perforation Treatment Performed - Open-Hole Completion
1966-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-07 Perforation Treatment Performed - Jet Perforation
1973-02-01 Well Fluid changed to Crude Oil
1973-02-01 Well Mode changed to Suspended
1979-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-08-07 Perforation Treatment Performed - Jet Perforation
1987-08-07 Plug Back Performed
1987-08-11 Perforation Treatment Performed - Cement Squeeze
1987-10-20 Perforation Treatment Performed - Cement Plug
1987-10-20 Perforation Treatment Performed - Open-Hole Completion
1987-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-24 Well Fluid changed to Crude Oil
1992-04-24 Well Mode changed to Flowing
1994-08-01 Well Fluid changed to Crude Oil
1994-08-01 Well Mode changed to Suspended
2007-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-09 Perforation Treatment Performed - Jet Perforation
2007-12-09 Plug Back Performed
2007-12-09 Well Fluid changed to Crude Oil
2007-12-09 Well Log Performed
2007-12-09 Well Mode changed to Abandoned Zone
2007-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-11 Perforation Treatment Performed - Remedial Casing
2007-12-12 Perforation Treatment Performed - Jet Perforation
2007-12-12 Well Log Performed
2007-12-13 Perforation Treatment Performed - Remedial Casing
2008-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-20 Perforation Treatment Performed - Jet Perforation
2008-01-20 Well Log Performed
2008-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-01 Perforation Treatment Performed - Remedial Casing
2009-02-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-15 Open Hole/Barefoot Completion 1544.40 1554.20 0
1969-05-07 Perforation 1363.10 1367.90 7
1969-05-07 Perforation 1371.60 1375.90 7
1969-05-07 Perforation 1385.00 1388.70 7
1969-05-07 Acid Treatment 1363.10 1388.70 0
1979-11-08 Packing Device Capped w/Cement 1218.50 1221.00 0
1987-08-07 Perforation 1363.10 1367.90 7
1987-08-07 Perforation 1371.60 1375.90 7
1987-08-07 Perforation 1385.00 1388.70 7
1987-08-11 Cement Squeeze 1363.10 1388.70 0
1987-10-20 Cement Plug 1558.50 1586.80 0
1966-04-26 Open Hole/Barefoot Completion 1544.40 1586.80 0
1987-10-20 Open Hole/Barefoot Completion 1544.40 1558.50 0
1987-10-22 Acid Treatment 1544.40 1558.50 0
2007-12-09 Packing Device Capped w/Cement 1342.00 1350.00 0
2007-12-09 Perforation 590.00 591.00 17
2007-12-11 Remedial Casing Cementing 590.00 591.00 0
2007-12-11 Packing Device Capped w/Cement 572.00 580.00 0
2007-12-12 Perforation 425.00 426.00 17
2007-12-13 Remedial Casing Cementing 425.00 426.00 0
2008-01-19 Packing Device Capped w/Cement 398.40 415.00 0
2008-01-20 Perforation 290.00 291.00 17
1966-04-29 Acid Treatment 1575.20 1586.80 0
2008-02-01 Remedial Casing Cementing 290.00 291.00 0
2008-02-01 Packing Device Capped w/Cement 277.00 285.00 0
1966-05-02 Acid Treatment 1575.20 1586.80 0
1966-05-04 Acid Treatment 1577.30 1586.80 0
1966-05-06 Acid Treatment 1574.60 1586.80 0
1966-05-07 Acid Treatment 1575.20 1586.80 0
1966-06-01 Acid Treatment 1544.40 1586.80 0
1966-06-02 Acid Treatment 1544.40 1586.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1989 5002 0.0 0.0 0.0
1992 1635 0.0 0.0 0.0

For data sources see[5]

References