X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514262212000

Well Details

Well ID: 0514262212000
Loading map...
Location: 00/12-22-051-26W4/0
Location Alias: 00/12-22-51-26 W4M
Location Alias 2: 00/12-22-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 22
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 106
Operator Name: Imperial Oil Resources Limited
License Number: 0006619
License Date: 1953-06-20
License Status: RecCertified
Spud Date: 1953-10-21
Final Drill Date: 1953-11-19
Well Total Depth: 1620.60 m
Surface Hole Latitude: 53.419576
Surface Hole Longitude: -113.760774

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-06-20 Obtained License
1953-11-06 Drill Stem Test Performed
1953-11-08 Drill Stem Test Performed
1953-11-16 Liner Casing Operation Performed
1953-11-19 Finished Drilling
1953-11-19 Well Mode changed to Drilled and Cased
1953-11-22 Perforation Treatment Performed - Acid Wash - No Pressure
1953-11-22 Perforation Treatment Performed - Jet Perforation
1953-11-26 Well Began Production
1953-11-26 Well Fluid changed to Crude Oil
1953-11-26 Well Mode changed to Flowing
1976-06-16 Well Fluid changed to Crude Oil
1976-06-16 Well Mode changed to Pumping
1982-08-10 Perforation Treatment Performed - Cement Squeeze
1982-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-12 Perforation Treatment Performed - Jet Perforation
1984-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-26 Perforation Treatment Performed - Cement Squeeze
1984-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-01 Perforation Treatment Performed - Jet Perforation
1988-03-01 Well Fluid changed to Crude Oil
1988-03-01 Well Mode changed to Suspended
1992-06-04 Well Log Performed
1992-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-31 Plug Back Performed
1992-07-31 Well Fluid changed to Crude Oil
1992-07-31 Well Log Performed
1992-07-31 Well Mode changed to Abandoned Zone
1992-08-04 Perforation Treatment Performed - Jet Perforation
1992-08-04 Well Log Performed
1992-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-08-06 Plug Back Performed
1992-08-07 Perforation Treatment Performed - Jet Perforation
1992-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-10 Plug Back Performed
1993-05-10 Well Log Performed
1993-05-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-22 Perforation 1617.00 1618.50 13
1992-07-31 Packing Device Capped w/Cement 1597.00 1605.00 0
1992-07-31 Packing Device Capped w/Cement 1546.00 1549.00 0
1992-08-04 Perforation 1361.00 1366.00 13
1992-08-06 Packing Device Capped w/Cement 1364.00 1367.00 0
1992-08-07 Perforation 1359.00 1361.00 13
1992-08-09 Acid Treatment 1359.00 1361.00 0
1993-05-10 Packing Device Capped w/Cement 1338.00 1346.00 0
1993-05-10 Packing Device Capped w/Cement 1257.00 1265.00 0
1953-11-22 Acid Wash 1617.00 1618.50 0
1982-08-10 Cement Squeeze 1617.00 1618.50 0
1982-08-12 Perforation 1616.90 1617.10 10
1982-08-12 Acid Treatment 1616.90 1617.10 0
1984-09-26 Acid Treatment 1616.90 1617.10 0
1984-09-26 Cement Squeeze 1616.90 1617.10 0
1984-10-01 Perforation 1615.80 1615.90 13
1984-10-01 Acid Treatment 1615.80 1615.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7093 0.0 0.0 0.0
1972 3260 0.0 0.0 0.0
1973 8549 0.0 0.0 0.0
1974 8495 0.0 0.0 0.0
1975 8594 0.0 0.0 0.0
1976 8359 0.0 0.0 0.0
1977 8075 0.0 0.0 0.0
1978 8507 0.0 0.0 0.0
1979 8104 0.0 0.0 0.0
1980 8519 0.0 0.0 0.0
1981 7792 0.0 0.0 0.0
1982 7232 0.0 0.0 0.0
1983 8523 0.0 0.0 0.0
1984 7852 0.0 0.0 0.0
1985 8194 0.0 0.0 0.0
1986 5612 0.0 0.0 0.0
1987 2651 0.0 0.0 0.0

For data sources see[5]

References