X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514262108000

Well Details

Well ID: 0514262108000
Loading map...
Location: 00/08-21-051-26W4/0
Location Alias: 00/08-21-51-26 W4M
Location Alias 2: 00/08-21-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 21
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO.72
Operator Name: Imperial Oil Resources Limited
License Number: 0002936
License Date: 1951-05-26
License Status: RecCertified
Spud Date: 1951-07-30
Final Drill Date: 1951-09-02
Well Total Depth: 1619.10 m
Surface Hole Latitude: 53.414732
Surface Hole Longitude: -113.765334

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-05-26 Obtained License
1951-08-07 Drill Stem Test Performed
1951-08-08 Drill Stem Test Performed
1951-08-13 Drill Stem Test Performed
1951-08-14 Drill Stem Test Performed
1951-08-30 Liner Casing Operation Performed
1951-09-02 Finished Drilling
1951-09-02 Well Mode changed to Drilled and Cased
1951-09-06 Perforation Treatment Performed - Acid Wash - No Pressure
1951-09-06 Perforation Treatment Performed - Jet Perforation
1951-09-07 Well Began Production
1951-09-07 Well Fluid changed to Crude Oil
1951-09-07 Well Mode changed to Flowing
1978-06-23 Well Fluid changed to Crude Oil
1978-06-23 Well Mode changed to Pumping
1988-08-12 Well Log Performed
1988-08-15 Perforation Treatment Performed - Cement Squeeze
1988-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-17 Perforation Treatment Performed - Jet Perforation
1992-01-17 Well Fluid changed to Crude Oil
1992-01-17 Well Mode changed to Suspended
1993-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-20 Perforation Treatment Performed - Jet Perforation
1993-08-20 Plug Back Performed
1993-08-20 Well Log Performed
1993-08-28 Perforation Treatment Performed - Remedial Casing
1993-08-28 Well Fluid changed to Crude Oil
1993-08-28 Well Mode changed to Abandoned
1993-09-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-06 Perforation 1615.40 1617.00 13
1951-09-06 Acid Wash 1615.40 1617.00 0
1988-08-15 Cement Squeeze 1615.40 1617.00 0
1988-08-17 Perforation 1613.00 1613.10 13
1988-08-17 Acid Treatment 1613.00 1613.10 0
1993-08-20 Packing Device Capped w/Cement 1593.00 1601.00 0
1993-08-20 Packing Device Capped w/Cement 1259.00 1267.00 0
1993-08-20 Perforation 160.00 160.50 14
1993-08-28 Remedial Casing Cementing 160.00 160.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7285 0.0 0.0 0.0
1969 1117 0.0 0.0 0.0
1970 2380 0.0 0.0 0.0
1971 6599 0.0 0.0 0.0
1972 8579 0.0 0.0 0.0
1973 8513 0.0 0.0 0.0
1974 6823 0.0 0.0 0.0
1975 8618 0.0 0.0 0.0
1976 8599 0.0 0.0 0.0
1977 8569 0.0 0.0 0.0
1978 6735 0.0 0.0 0.0
1979 8368 0.0 0.0 0.0
1980 8315 0.0 0.0 0.0
1981 8246 0.0 0.0 0.0
1982 8432 0.0 0.0 0.0
1983 7837 0.0 0.0 0.0
1984 8346 0.0 0.0 0.0
1985 8407 0.0 0.0 0.0
1986 7558 0.0 0.0 0.0
1987 8111 0.0 0.0 0.0
1988 8187 0.0 0.0 0.0
1989 7970 0.0 0.0 0.0
1990 8718 0.0 0.0 0.0
1991 8203 0.0 0.0 0.0
1992 390 0.0 0.0 0.0

For data sources see[5]

References