X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261605000

Well Details

Well ID: 0514261605000
Loading map...
Location: 00/05-16-051-26W4/0
Location Alias: 00/05-16-51-26 W4M
Location Alias 2: 00/05-16-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 45.
Operator Name: Imperial Oil Resources Limited
License Number: 0002586
License Date: 1951-02-01
License Status: RecCertified
Spud Date: 1951-03-12
Final Drill Date: 1951-04-11
Well Total Depth: 1621.50 m
Surface Hole Latitude: 53.401585
Surface Hole Longitude: -113.784380

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-02-01 Obtained License
1951-03-24 Drill Stem Test Performed
1951-03-28 Drill Stem Test Performed
1951-04-04 Drill Stem Test Performed
1951-04-05 Drill Stem Test Performed
1951-04-07 Liner Casing Operation Performed
1951-04-11 Finished Drilling
1951-04-11 Well Mode changed to Drilled and Cased
1951-04-14 Perforation Treatment Performed - Acid Wash - No Pressure
1951-04-14 Perforation Treatment Performed - Bullet Perforation
1951-04-15 Well Began Production
1951-04-15 Well Fluid changed to Crude Oil
1951-04-15 Well Mode changed to Flowing
1977-07-06 Well Fluid changed to Crude Oil
1977-07-06 Well Mode changed to Pumping
1983-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-08 Perforation Treatment Performed - Cement Squeeze
1983-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-10 Perforation Treatment Performed - Jet Perforation
1983-03-14 Perforation Treatment Performed - Cement Squeeze
1983-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-16 Perforation Treatment Performed - Jet Perforation
1987-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-15 Perforation Treatment Performed - Cement Squeeze
1987-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-22 Perforation Treatment Performed - Jet Perforation
1987-05-22 Well Log Performed
1991-05-22 Well Fluid changed to Crude Oil
1991-05-22 Well Mode changed to Suspended
1993-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-05 Perforation Treatment Performed - Jet Perforation
1993-08-05 Plug Back Performed
1993-08-05 Well Log Performed
1993-08-28 Perforation Treatment Performed - Remedial Casing
1993-08-28 Well Fluid changed to Crude Oil
1993-08-28 Well Mode changed to Abandoned
1993-08-31 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-04-14 Bullet Perforation 1617.90 1619.40 13
1987-05-14 Acid Treatment 1617.80 1618.00 0
1987-05-15 Cement Squeeze 1617.80 1618.00 0
1987-05-22 Perforation 1616.80 1617.00 13
1987-05-22 Acid Treatment 1616.80 1617.00 0
1993-08-05 Packing Device Capped w/Cement 1555.00 1562.00 0
1993-08-05 Perforation 159.00 159.50 13
1993-08-28 Remedial Casing Cementing 159.00 159.50 0
1951-04-14 Acid Wash 1617.90 1619.40 0
1983-03-07 Acid Treatment 1617.90 1619.40 0
1983-03-08 Cement Squeeze 1617.90 1619.40 0
1983-03-10 Perforation 1617.00 1617.20 10
1983-03-10 Acid Treatment 1617.00 1617.20 0
1983-03-14 Cement Squeeze 1617.00 1617.20 0
1983-03-16 Perforation 1617.80 1618.00 10
1983-03-16 Acid Treatment 1617.80 1618.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8529 0.0 0.0 0.0
1968 8047 0.0 0.0 0.0
1969 3542 0.0 0.0 0.0
1971 3216 0.0 0.0 0.0
1972 6560 0.0 0.0 0.0
1973 8556 0.0 0.0 0.0
1974 8571 0.0 0.0 0.0
1975 8618 0.0 0.0 0.0
1976 8599 0.0 0.0 0.0
1977 7703 0.0 0.0 0.0
1978 8307 0.0 0.0 0.0
1979 8391 0.0 0.0 0.0
1980 8527 0.0 0.0 0.0
1981 8359 0.0 0.0 0.0
1982 6900 0.0 0.0 0.0
1983 7263 0.0 0.0 0.0
1984 7740 0.0 0.0 0.0
1985 8404 0.0 0.0 0.0
1986 4732 0.0 0.0 0.0
1987 5258 0.0 0.0 0.0
1988 8561 0.0 0.0 0.0
1989 8272 0.0 0.0 0.0
1990 7518 0.0 0.0 0.0
1991 2998 0.0 0.0 0.0

For data sources see[5]

References