X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261604000

Well Details

Well ID: 0514261604000
Loading map...
Location: 00/04-16-051-26W4/0
Location Alias: 00/04-16-51-26 W4M
Location Alias 2: 00/04-16-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND #77
Operator Name: Imperial Oil Resources Limited
License Number: 0003039
License Date: 1951-06-15
License Status: RecCertified
Spud Date: 1951-07-07
Final Drill Date: 1951-08-09
Well Total Depth: 1621.50 m
Surface Hole Latitude: 53.397968
Surface Hole Longitude: -113.784405

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-15 Obtained License
1951-07-21 Drill Stem Test Performed
1951-07-22 Drill Stem Test Performed
1951-07-29 Drill Stem Test Performed
1951-07-30 Drill Stem Test Performed
1951-08-01 Drill Stem Test Performed
1951-08-05 Liner Casing Operation Performed
1951-08-09 Finished Drilling
1951-08-09 Well Mode changed to Drilled and Cased
1951-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-08-13 Perforation Treatment Performed - Jet Perforation
1951-08-13 Well Began Production
1951-08-13 Well Fluid changed to Crude Oil
1951-08-13 Well Mode changed to Flowing
1973-09-20 Perforation Treatment Performed - Cement Squeeze
1973-09-21 Perforation Treatment Performed - Jet Perforation
1973-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-01 Well Fluid changed to Crude Oil
1973-10-01 Well Mode changed to Pumping
1982-10-05 Perforation Treatment Performed - Cement Squeeze
1982-10-08 Perforation Treatment Performed - Jet Perforation
1982-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-11 Well Fluid changed to Crude Oil
1983-04-11 Well Mode changed to Suspended
1985-08-26 Perforation Treatment Performed - Cement Plug
1985-08-26 Plug Back Performed
1995-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-30 Perforation Treatment Performed - Jet Perforation
1995-08-30 Plug Back Performed
1995-08-30 Well Log Performed
1995-09-12 Well Abandoned
1995-09-12 Well Fluid changed to Crude Oil
1995-09-12 Well Mode changed to Abandoned
1995-09-25 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-08-13 Perforation 1618.80 1620.30 13
1995-08-30 Packing Device Capped w/Cement 1222.00 1230.00 0
1995-08-30 Perforation 160.00 161.00 13
1995-09-25 Remedial Casing Cementing 160.00 161.00 0
1951-08-13 Acid Treatment 1618.80 1620.30 0
1973-09-20 Cement Squeeze 1618.80 1620.30 0
1973-09-21 Perforation 1618.80 1619.40 7
1973-09-24 Acid Treatment 1618.80 1619.40 0
1982-10-05 Cement Squeeze 1618.80 1619.40 0
1982-10-08 Perforation 1618.10 1618.30 10
1982-10-12 Acid Treatment 1618.10 1618.30 0
1985-08-26 Cement Plug 1480.00 1621.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2408 0.0 0.0 0.0
1968 408 0.0 0.0 0.0
1969 384 0.0 0.0 0.0
1970 2208 0.0 0.0 0.0
1971 1896 0.0 0.0 0.0
1972 1464 0.0 0.0 0.0
1973 3771 0.0 0.0 0.0
1974 1056 0.0 0.0 0.0

For data sources see[5]

References