X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261603020

Well Details

Well ID: 0514261603020
Loading map...
Location: 02/03-16-051-26W4/0
Location Alias: 02/03-16-51-26 W4M
Location Alias 2: 02/03-16-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: IMP UD 26 108 WD LEDUC IN 3-16-51-26
Operator Name: Imperial Oil Limited
License Number: 0006898
License Date: 1953-08-07
License Status: RecExempt
Spud Date: 1953-10-15
Final Drill Date: 1953-11-03
Well Total Depth: 1530.10 m
Surface Hole Latitude: 53.398196
Surface Hole Longitude: -113.777778

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-08-07 Obtained License
1953-10-27 Drill Stem Test Performed
1953-11-03 Finished Drilling
1953-11-03 Production Casing Operation Performed
1953-11-03 Well Mode changed to Drilled and Cased
1953-11-05 Perforation Treatment Performed - Open-Hole Completion
1953-11-07 Well Began Production
1953-11-07 Well Fluid changed to Crude Oil
1953-11-07 Well Mode changed to Flowing
1959-10-31 Perforation Treatment Performed - Jet Perforation
1959-11-17 Perforation Treatment Performed - Acid Wash - No Pressure
1959-12-04 Perforation Treatment Performed - Jet Perforation
1959-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-01 Well Began Injection
1960-01-01 Well Fluid changed to Gas
1960-01-01 Well Type changed to Injection
1970-03-11 Well Fluid changed to Gas
1970-03-11 Well Mode changed to Suspended
1970-03-11 Well Type changed to Injection
1972-11-02 Perforation Treatment Performed - Cement Plug
1972-11-09 Well Abandoned
1972-11-09 Well Fluid changed to Gas
1972-11-09 Well Mode changed to Abandoned
1972-11-09 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-05 Open Hole/Barefoot Completion 1516.10 1530.10 0
1959-10-31 Perforation 1490.80 1495.30 7
1959-10-31 Perforation 1498.40 1501.40 7
1959-11-17 Acid Wash 1490.80 1501.40 0
1959-12-04 Perforation 1498.40 1509.10 7
1959-12-05 Acid Treatment 1490.80 1509.10 0
1972-11-02 Cement Plug 1475.20 1530.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

References