X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260912000

Well Details

Well ID: 0514260912000
Loading map...
Location: 00/12-09-051-26W4/0
Location Alias: 00/12-09-51-26 W4M
Location Alias 2: 00/12-09-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 09
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 60
Operator Name: Imperial Oil Resources Limited
License Number: 0002834
License Date: 1951-05-03
License Status: Abandoned
Spud Date: 1951-05-12
Final Drill Date: 1951-06-11
Well Total Depth: 1621.80 m
Surface Hole Latitude: 53.390552
Surface Hole Longitude: -113.784435

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-05-03 Obtained License
1951-05-26 Drill Stem Test Performed
1951-05-28 Drill Stem Test Performed
1951-05-29 Drill Stem Test Performed
1951-06-03 Drill Stem Test Performed
1951-06-04 Drill Stem Test Performed
1951-06-05 Drill Stem Test Performed
1951-06-08 Liner Casing Operation Performed
1951-06-11 Finished Drilling
1951-06-11 Well Mode changed to Drilled and Cased
1951-06-14 Perforation Treatment Performed - Acid Wash - No Pressure
1951-06-14 Perforation Treatment Performed - Jet Perforation
1951-06-14 Well Began Production
1951-06-14 Well Fluid changed to Crude Oil
1951-06-14 Well Mode changed to Flowing
1976-01-29 Well Fluid changed to Crude Oil
1976-01-29 Well Mode changed to Pumping
1976-02-01 Well Fluid changed to Crude Oil
1976-02-01 Well Mode changed to Pumping
1982-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-13 Perforation Treatment Performed - Cement Squeeze
1982-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-18 Perforation Treatment Performed - Jet Perforation
1990-02-06 Well Fluid changed to Crude Oil
1990-02-06 Well Mode changed to Suspended
1996-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-13 Perforation Treatment Performed - Jet Perforation
1996-08-13 Plug Back Performed
1996-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-06 Perforation Treatment Performed - Remedial Casing
1996-09-12 Well Abandoned
1996-09-12 Well Fluid changed to Crude Oil
1996-09-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-06-14 Perforation 1617.00 1618.50 13
1996-09-06 Remedial Casing Cementing 160.00 161.00 0
1996-09-06 Packing Device Capped w/Cement 50.90 165.00 0
1951-06-14 Acid Wash 1617.00 1618.50 0
1982-05-11 Acid Treatment 1617.00 1618.50 0
1982-05-13 Cement Squeeze 1617.00 1618.50 0
1982-05-18 Perforation 1617.50 1617.70 13
1982-05-18 Acid Treatment 1617.50 1617.70 0
1996-08-13 Packing Device Capped w/Cement 1560.80 1568.50 0
1996-08-13 Packing Device Capped w/Cement 1232.00 1240.00 0
1996-08-13 Perforation 160.00 161.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1970 6016 0.0 0.0 0.0
1971 6312 0.0 0.0 0.0
1972 8352 0.0 0.0 0.0
1973 8593 0.0 0.0 0.0
1974 8585 0.0 0.0 0.0
1975 8551 0.0 0.0 0.0
1976 8491 0.0 0.0 0.0
1977 8436 0.0 0.0 0.0
1978 8087 0.0 0.0 0.0
1979 8487 0.0 0.0 0.0
1980 7718 0.0 0.0 0.0
1981 8030 0.0 0.0 0.0
1982 7088 0.0 0.0 0.0
1983 8547 0.0 0.0 0.0
1984 7498 0.0 0.0 0.0
1985 8369 0.0 0.0 0.0
1986 8188 0.0 0.0 0.0
1987 8095 0.0 0.0 0.0
1988 8562 0.0 0.0 0.0
1989 8069 0.0 0.0 0.0
1990 778 0.0 0.0 0.0

For data sources see[5]

References