X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260903000

Well Details

Well ID: 0514260903000
Loading map...
Location: 00/03-09-051-26W4/0
Location Alias: 00/03-09-51-26 W4M
Location Alias 2: 00/03-09-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 09
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 21
Operator Name: Imperial Oil Resources Limited
License Number: 0000113
License Date: 1949-06-21
License Status: RecCertified
Spud Date: 1949-07-01
Final Drill Date: 1949-07-29
Well Total Depth: 1622.50 m
Surface Hole Latitude: 53.383085
Surface Hole Longitude: -113.778865

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-06-21 Obtained License
1949-07-19 Drill Stem Test Performed
1949-07-20 Drill Stem Test Performed
1949-07-21 Drill Stem Test Performed
1949-07-23 Drill Stem Test Performed
1949-07-26 Liner Casing Operation Performed
1949-07-29 Finished Drilling
1949-07-29 Well Mode changed to Drilled and Cased
1949-07-31 Perforation Treatment Performed - Bullet Perforation
1949-08-02 Perforation Treatment Performed - Bullet Perforation
1949-08-03 Well Began Production
1949-08-03 Well Fluid changed to Crude Oil
1949-08-03 Well Mode changed to Flowing
1971-06-10 Well Fluid changed to Crude Oil
1971-06-10 Well Mode changed to Pumping
1979-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-27 Perforation Treatment Performed - Cement Squeeze
1979-05-29 Perforation Treatment Performed - Jet Perforation
1979-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-11 Well Fluid changed to Crude Oil
1983-04-11 Well Mode changed to Suspended
1985-05-22 Well Log Performed
1985-05-23 Perforation Treatment Performed - Cement Squeeze
1985-05-24 Well Log Performed
1985-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-27 Perforation Treatment Performed - Jet Perforation
1985-06-11 Perforation Treatment Performed - Cement Plug
1985-06-11 Plug Back Performed
1996-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-07 Perforation Treatment Performed - Jet Perforation
1996-08-07 Plug Back Performed
1996-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-06 Perforation Treatment Performed - Remedial Casing
1996-09-11 Well Abandoned
1996-09-11 Well Fluid changed to Crude Oil
1996-09-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-07-31 Bullet Perforation 1618.80 1620.30 20
1985-06-11 Cement Plug 1486.00 1617.60 0
1996-08-07 Packing Device Capped w/Cement 1232.00 1240.00 0
1996-08-07 Perforation 160.00 161.00 13
1996-09-06 Remedial Casing Cementing 160.00 161.00 0
1996-09-06 Packing Device Capped w/Cement 35.60 170.00 0
1949-08-02 Bullet Perforation 1618.80 1620.30 20
1979-05-24 Acid Treatment 1618.80 1620.30 0
1979-05-27 Cement Squeeze 1618.80 1620.30 0
1979-05-29 Perforation 1618.20 1618.40 0
1979-05-30 Acid Treatment 1618.20 1618.40 0
1985-05-23 Cement Squeeze 1618.20 1618.40 0
1985-05-27 Perforation 1617.00 1617.50 13
1985-05-27 Acid Treatment 1617.00 1617.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 125 0.0 0.0 0.0
1971 4416 0.0 0.0 0.0
1972 8580 0.0 0.0 0.0
1973 8367 0.0 0.0 0.0
1974 8434 0.0 0.0 0.0
1975 7132 0.0 0.0 0.0
1976 7120 0.0 0.0 0.0
1977 7836 0.0 0.0 0.0
1978 6287 0.0 0.0 0.0
1979 5128 0.0 0.0 0.0
1980 8354 0.0 0.0 0.0
1981 3225 0.0 0.0 0.0
1982 1932 0.0 0.0 0.0
1983 168 0.0 0.0 0.0

For data sources see[5]

References