X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260510000

Well Details

Well ID: 0514260510000
Loading map...
Location: 00/10-05-051-26W4/0
Location Alias: 00/10-05-51-26 W4M
Location Alias 2: 00/10-05-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 05
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 26
Operator Name: Imperial Oil Resources Limited
License Number: 0001362
License Date: 1950-04-15
License Status: RecCertified
Spud Date: 1950-04-23
Final Drill Date: 1950-05-20
Well Total Depth: 1618.50 m
Surface Hole Latitude: 53.376170
Surface Hole Longitude: -113.795862

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-04-15 Obtained License
1950-05-12 Drill Stem Test Performed
1950-05-13 Drill Stem Test Performed
1950-05-17 Liner Casing Operation Performed
1950-05-20 Finished Drilling
1950-05-20 Well Mode changed to Drilled and Cased
1950-05-23 Perforation Treatment Performed - Jet Perforation
1950-05-24 Well Began Production
1950-05-24 Well Fluid changed to Crude Oil
1950-05-24 Well Mode changed to Flowing
1973-09-28 Perforation Treatment Performed - Acid Wash - No Pressure
1973-09-28 Perforation Treatment Performed - Cement Squeeze
1973-10-01 Perforation Treatment Performed - Acid Wash - No Pressure
1973-10-01 Perforation Treatment Performed - Jet Perforation
1973-10-03 Perforation Treatment Performed - Cement Squeeze
1973-10-04 Perforation Treatment Performed - Jet Perforation
1973-10-05 Perforation Treatment Performed - Acid Wash - No Pressure
1973-11-09 Well Fluid changed to Crude Oil
1973-11-09 Well Mode changed to Pumping
1984-11-16 Well Log Performed
1984-11-19 Well Log Performed
1988-03-07 Well Log Performed
1988-03-10 Well Log Performed
1988-03-11 Well Log Performed
1988-03-14 Well Log Performed
1988-03-17 Well Log Performed
1991-09-25 Well Fluid changed to Crude Oil
1991-09-25 Well Mode changed to Suspended
1996-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-13 Plug Back Performed
1996-05-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-14 Perforation Treatment Performed - Jet Perforation
1996-05-14 Well Log Performed
1996-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-23 Perforation Treatment Performed - Remedial Casing
1996-05-25 Well Abandoned
1996-05-25 Well Fluid changed to Crude Oil
1996-05-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-05-23 Perforation 1614.80 1616.40 0
1996-05-14 Packing Device Capped w/Cement 1233.00 1241.00 0
1996-05-14 Perforation 160.00 161.00 13
1996-05-23 Remedial Casing Cementing 160.00 161.00 0
1996-05-23 Packing Device Capped w/Cement 168.00 168.00 0
1973-09-28 Acid Wash 1614.80 1616.40 0
1973-09-28 Cement Squeeze 1614.80 1616.40 0
1973-10-01 Perforation 1616.70 1616.70 3
1973-10-01 Acid Wash 1616.70 1616.70 0
1973-10-03 Cement Squeeze 1616.70 1616.70 0
1973-10-04 Perforation 1615.10 1615.10 0
1973-10-05 Acid Wash 1615.10 1615.10 0
1996-05-13 Packing Device Capped w/Cement 1567.00 1575.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1968 120 0.0 0.0 0.0
1971 192 0.0 0.0 0.0
1973 1440 0.0 0.0 0.0
1976 3088 0.0 0.0 0.0
1977 8440 0.0 0.0 0.0
1978 8003 0.0 0.0 0.0
1979 8019 0.0 0.0 0.0
1980 8462 0.0 0.0 0.0
1981 7950 0.0 0.0 0.0
1982 7545 0.0 0.0 0.0
1983 7959 0.0 0.0 0.0
1984 8198 0.0 0.0 0.0
1985 7356 0.0 0.0 0.0
1986 8429 0.0 0.0 0.0
1987 8442 0.0 0.0 0.0
1988 7726 0.0 0.0 0.0
1989 8359 0.0 0.0 0.0
1990 7159 0.0 0.0 0.0
1991 5649 0.0 0.0 0.0

For data sources see[5]

References