X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260405020

Well Details

Well ID: 0514260405020
Loading map...
Location: 02/05-04-051-26W4/0
Location Alias: 02/05-04-51-26 W4M
Location Alias 2: 02/05-04-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 04
County/Municipality: Parkland County
Well Name: HOME-ANGLO WOODBEND #5-2 WELL
Operator Name: Imperial Oil Resources Limited
License Number: 0001174
License Date: 1950-02-08
License Status: Abandoned
Spud Date: 1950-02-11
Final Drill Date: 1950-03-11
Well Total Depth: 1535.00 m
Surface Hole Latitude: 53.372068
Surface Hole Longitude: -113.784625

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-02-08 Obtained License
1950-03-06 Drill Stem Test Performed
1950-03-07 Production Casing Operation Performed
1950-03-11 Finished Drilling
1950-03-11 Perforation Treatment Performed - Open-Hole Completion
1950-03-11 Well Mode changed to Drilled and Cased
1950-03-12 Well Began Production
1950-03-12 Well Fluid changed to Crude Oil
1950-03-12 Well Mode changed to Flowing
1961-08-18 Well Fluid changed to Crude Oil
1961-08-18 Well Mode changed to Pumping
1978-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-22 Well Fluid changed to Crude Oil
1984-02-22 Well Mode changed to Suspended
1996-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-29 Perforation Treatment Performed - Jet Perforation
1996-07-29 Plug Back Performed
1996-07-29 Well Fluid changed to Crude Oil
1996-07-29 Well Mode changed to Abandoned Zone
1996-08-06 Perforation Treatment Performed - Remedial Casing
1996-08-07 Well Abandoned
1996-08-07 Well Fluid changed to Crude Oil
1996-08-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-03-11 Open Hole/Barefoot Completion 1519.40 1535.00 0
1978-10-05 Acid Treatment 1519.40 1535.00 0
1996-07-29 Packing Device Capped w/Cement 1507.00 1515.00 0
1996-07-29 Packing Device Capped w/Cement 1232.00 1240.00 0
1996-07-29 Perforation 160.00 161.00 13
1996-08-06 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7947 0.0 0.0 0.0
1968 8783 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 8679 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8619 0.0 0.0 0.0
1973 8467 0.0 0.0 0.0
1974 8583 0.0 0.0 0.0
1975 8067 0.0 0.0 0.0
1976 5231 0.0 0.0 0.0
1978 2040 0.0 0.0 0.0
1979 8037 0.0 0.0 0.0
1980 8527 0.0 0.0 0.0
1981 5690 0.0 0.0 0.0
1982 7579 0.0 0.0 0.0
1983 6348 0.0 0.0 0.0

For data sources see[5]

References