X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514251608020

Well Details

Well ID: 0514251608020
Loading map...
Location: 02/08-16-051-25W4/0
Location Alias: 02/08-16-51-25 W4M
Location Alias 2: 02/08-16-051-25 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 25
Section: 16
County/Municipality: Edmonton
Well Name: NCO WHITEMUD 8-16-51-25
Operator Name: Canadian Natural Resources Limited
License Number: 0007686
License Date: 1954-02-15
License Status: RecExempt
Spud Date: 1954-02-20
Final Drill Date: 1954-03-01
Well Total Depth: 1269.50 m
Surface Hole Latitude: 53.401033
Surface Hole Longitude: -113.617864

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-02-15 Obtained License
1954-03-01 Finished Drilling
1954-03-03 Production Casing Operation Performed
1954-03-05 Perforation Treatment Performed - Bullet Perforation
1954-03-06 Perforation Treatment Performed - Bullet Perforation
1954-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-03-09 Perforation Treatment Performed - Cement Squeeze
1954-03-09 Perforation Treatment Performed - Jet Perforation
1954-03-10 Perforation Treatment Performed - Bullet Perforation
1954-03-12 Perforation Treatment Performed - Fractured
1954-04-20 Perforation Treatment Performed - Bullet Perforation
1954-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-04-24 Perforation Treatment Performed - Bullet Perforation
1954-09-30 Perforation Treatment Performed - Cement Plug
1954-10-12 Well Abandoned
1954-10-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-03-05 Bullet Perforation 1251.50 1253.30 16
1954-04-24 Bullet Perforation 1241.80 1242.40 7
1954-04-24 Bullet Perforation 1243.00 1243.60 20
1954-04-24 Bullet Perforation 1243.60 1243.90 13
1954-09-30 Cement Plug 1213.10 1248.50 0
1954-03-06 Bullet Perforation 1251.50 1253.30 16
1954-03-08 Acid Treatment 1251.50 1253.30 0
1954-03-09 Cement Squeeze 1251.50 1253.30 0
1954-03-09 Perforation 1239.00 1240.80 20
1954-03-10 Bullet Perforation 1243.00 1244.50 16
1954-03-12 Fracture 1239.00 1244.50 0
1954-04-20 Bullet Perforation 1238.70 1243.00 13
1954-04-22 Acid Treatment 1238.70 1243.00 0

For data sources see[4]



References