X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514251509000

Well Details

Well ID: 0514251509000
Loading map...
Location: 00/09-15-051-25W4/0
Location Alias: 00/09-15-51-25 W4M
Location Alias 2: 00/09-15-051-25 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 25
Section: 15
County/Municipality: Edmonton
Well Name: NEW PACALTA WHITEMUD NO. 1
Operator Name: Stone Petroleums Ltd.
License Number: B0002899
License Date: 1949-05-27
License Status: RecCertified
Spud Date: 1949-05-28
Final Drill Date: 1949-06-17
Well Total Depth: 1244.80 m
Surface Hole Latitude: 53.404916
Surface Hole Longitude: -113.593225

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-05-27 Obtained License
1949-06-14 Drill Stem Test Performed
1949-06-16 Drill Stem Test Performed
1949-06-17 Drill Stem Test Performed
1949-06-17 Finished Drilling
1949-06-17 Well Mode changed to Drilled and Cased
1949-06-19 Liner Casing Operation Performed
1949-07-01 Perforation Treatment Performed - Bullet Perforation
1949-07-04 Perforation Treatment Performed - Cement Squeeze
1949-07-05 Perforation Treatment Performed - Bullet Perforation
1949-07-12 Well Began Production
1949-07-12 Well Fluid changed to Crude Oil
1949-07-12 Well Mode changed to Pumping
1949-07-15 Perforation Treatment Performed - Jet Perforation
1949-10-31 Perforation Treatment Performed - Cement Squeeze
1949-11-04 Perforation Treatment Performed - Open-Hole Completion
1949-11-05 Drill Stem Test Performed
1949-11-06 Perforation Treatment Performed - Jet Perforation
1970-10-05 Well Fluid changed to Crude Oil
1970-10-05 Well Mode changed to Suspended
1973-09-27 Perforation Treatment Performed - Cement Plug
1973-09-27 Well Fluid changed to Crude Oil
1973-09-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-07-01 Bullet Perforation 1241.50 1242.70 16
1949-07-04 Cement Squeeze 1241.50 1242.70 0
1949-07-05 Bullet Perforation 1243.00 1243.60 33
1949-07-15 Perforation 1242.70 1243.60 7
1949-10-31 Cement Squeeze 1242.70 1243.60 0
1949-11-04 Open Hole/Barefoot Completion 1243.60 1244.80 0
1949-11-06 Perforation 1243.30 1244.50 13
1973-09-27 Cement Plug 1205.50 1244.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 945 0.0 0.0 0.0
1969 2831 0.0 0.0 0.0

For data sources see[5]

References