X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514163608005

Well Details

Well ID: 0514163608005
Loading map...
Location: 00/08-36-051-16W4/5
Location Alias: 00/08-36-51-16 W4M
Location Alias 2: 00/08-36-051-16 W4/05
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 16
Section: 36
County/Municipality: County of Minburn No. 27
Well Name: OMERS ENERGY ET AL INLAND 8-36-51-16
Operator Name: AlphaBow Energy Ltd.
License Number: 0411943
License Date: 2009-08-21
License Status: Suspension
Spud Date: 2009-09-01
Final Drill Date: 2009-09-04
Well Total Depth: 1016.00 m
Surface Hole Latitude: 53.447326
Surface Hole Longitude: -112.212796

For data sources see[1][2]

Well History

Date Event
2009-08-21 Obtained License
2009-09-02 Surface Casing Operation Performed
2009-09-04 Finished Drilling
2009-09-04 Well Log Performed
2009-09-04 Well Mode changed to Drilled and Cased
2009-09-05 Production Casing Operation Performed
2009-09-05 Rig Released
2009-09-15 Well Log Performed
2009-09-28 Perforation Treatment Performed - Jet Perforation
2009-09-28 Well Log Performed
2009-10-16 Perforation Treatment Performed - Jet Perforation
2009-10-16 Well Log Performed
2009-10-20 Perforation Treatment Performed - Fractured
2009-10-20 Perforation Treatment Performed - Jet Perforation
2009-11-19 Perforation Treatment Performed - Jet Perforation
2010-01-06 Perforation Treatment Performed - Jet Perforation
2010-03-09 Perforation Treatment Performed - Jet Perforation
2010-03-11 Perforation Treatment Performed - Remedial Casing
2010-04-20 Perforation Treatment Performed - Jet Perforation
2010-06-23 Perforation Treatment Performed - Jet Perforation
2010-10-21 Well Began Production
2010-10-21 Well Fluid changed to Gas
2010-10-21 Well Mode changed to Flowing
2015-08-31 Well Fluid changed to Gas
2015-08-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-28 Perforation 950.00 950.50 17
2010-06-23 Perforation 879.00 880.00 17
2009-10-16 Perforation 936.00 937.00 17
2009-10-20 Perforation 924.00 925.00 17
2009-10-20 Fracture 924.00 925.00 0
2009-11-19 Perforation 893.50 894.00 17
2010-01-06 Perforation 894.00 894.50 17
2010-03-09 Perforation 896.50 896.80 17
2010-03-11 Remedial Casing Cementing 893.50 896.80 0
2010-04-20 Perforation 893.50 894.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1918 0.0 0.0 0.0
2011 8415 0.0 0.0 0.0
2012 1947 0.0 0.0 0.0
2013 4736 0.0 0.0 0.0

For data sources see[5]

References