X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514090613020

Well Details

Well ID: 0514090613020
Loading map...
Location: 02/13-06-051-09W4/0
Location Alias: 02/13-06-51-09 W4M
Location Alias 2: 02/13-06-051-09 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 09
Section: 06
County/Municipality: County of Minburn No. 27
Well Name: PEINC 02 MANN 13-6-51-9
Operator Name: Perpetual Energy Inc.
License Number: 0482083
License Date: 2016-12-21
License Status: Issued
Spud Date: 2016-12-29
Final Drill Date: 2017-01-05
Well Total Depth: 2037.00 m
Surface Hole Latitude: 53.367240
Surface Hole Longitude: -111.317573

For data sources see[1][2]

Well History

Date Event
2016-12-21 Obtained License
2016-12-29 Direction Drilling Operation Performed - Deviate
2016-12-30 Surface Casing Operation Performed
2016-12-31 Direction Drilling Operation Performed - Horizontal
2017-01-05 Finished Drilling
2017-01-05 Well Log Performed
2017-01-05 Well Mode changed to Drilled and Cased
2017-01-06 Production Casing Operation Performed
2017-01-07 Rig Released
2017-01-10 Well Log Performed
2017-01-13 Perforation Treatment Performed - Jet Perforation
2017-01-13 Well Log Performed
2017-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-08 Perforation Treatment Performed - Jet Perforation
2017-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-13 Well Log Performed
2017-02-28 Well Began Production
2017-02-28 Well Fluid changed to Gas
2017-02-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-29 Precision Drilling Corporation 187 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-12-29 112.70 Deviate (5 - 79 degrees)
2016-12-31 549.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-13 Perforation 1972.00 1972.50 9
2017-02-08 Multi-Stage Fracture 1493.40 1493.50 0
2017-02-08 Multi-Stage Fracture 1433.40 1433.50 0
2017-02-08 Multi-Stage Fracture 1374.40 1374.50 0
2017-02-08 Multi-Stage Fracture 1314.40 1314.50 0
2017-02-08 Multi-Stage Fracture 1254.40 1254.50 0
2017-02-08 Multi-Stage Fracture 1207.40 1207.50 0
2017-02-08 Multi-Stage Fracture 1148.40 1148.50 0
2017-02-08 Multi-Stage Fracture 1090.40 1090.50 0
2017-02-08 Multi-Stage Fracture 1031.40 1031.50 0
2017-02-08 Multi-Stage Fracture 972.40 972.50 0
2017-02-05 Multi-Stage Fracture 1961.40 1961.50 0
2017-02-08 Multi-Stage Fracture 913.40 913.50 0
2017-02-08 Perforation 854.40 854.50 3
2017-02-08 Multi-Stage Fracture 795.40 795.50 0
2017-02-08 Multi-Stage Fracture 738.40 738.50 0
2017-02-08 Multi-Stage Fracture 680.40 680.50 0
2017-02-08 Multi-Stage Fracture 621.40 621.50 0
2017-02-08 Multi-Stage Fracture 550.40 550.50 0
2017-02-05 Multi-Stage Fracture 1904.40 1904.50 0
2017-02-07 Multi-Stage Fracture 1839.40 1839.50 0
2017-02-07 Multi-Stage Fracture 1791.40 1791.50 0
2017-02-07 Multi-Stage Fracture 1731.40 1731.50 0
2017-02-07 Multi-Stage Fracture 1672.40 1672.50 0
2017-02-07 Multi-Stage Fracture 1612.40 1612.50 0
2017-02-08 Multi-Stage Fracture 1553.40 1553.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-05 2017-02-08 461 1,214 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 49.1716 N/A
Sand (30/50) Canyon Technical Services Aluminum Oxide 1344-28-1 100 40.2063 N/A
Crystalline silica. quartz 14808-60-7 100 40.2063 N/A
Iron Oxide 1309-37-1 100 40.2063 N/A
Titanium Oxide 13463-67-7 100 40.2062 N/A
CAN-2310 Breaker (Enzyme LpH. 1000L:1L) Canyon Technical Services Breaker Ethylene Glycol 107-21-1 100 0.1093 N/A
Water 7732-18-5 100 0.1095 N/A
CAN-1636 pH Buffer (LpH) Canyon Technical Services Buffer Acetic Acid 64-19-7 100 0.0742 N/A
Water 7732-18-5 100 0.0742 N/A
CAN-1911 Clay Stabilizer Canyon Technical Services Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.3238 N/A
Water 7732-18-5 100 0.3238 N/A
CO2 - Liquid Canyon Technical Services Energizing Fluid Carbon Dioxide 124-38-9 100 9.8125 N/A
CAN-2010 Gellant (CMHPG) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.3017 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-29 2017-01-31 Surface Water - Lake 1214

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5326 0.0 0.0 0.0
2018 6838 0.0 0.0 0.0
2019 8035 0.0 0.0 0.0
2020 2035 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-07 No Incident Encountered 0.00 0.00
2017-01-13 No Incident Encountered 0.00 0.00
2017-02-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References