X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514030606000

Well Details

Well ID: 0514030606000
Loading map...
Location: 00/06-06-051-03W4/0
Location Alias: 00/06-06-51-03 W4M
Location Alias 2: 00/06-06-051-03 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 03
Section: 06
County/Municipality: County of Vermilion River
Well Name: DEVON LLOYD 6-6-51-3
Operator Name: Devon Canada Corporation
License Number: 0119439
License Date: 1985-11-19
License Status: RecCertified
Spud Date: 1985-12-02
Final Drill Date: 1985-12-04
Well Total Depth: 710.00 m
Surface Hole Latitude: 53.369677
Surface Hole Longitude: -110.440294

For data sources see[1][2]

Well History

Date Event
1985-11-19 Obtained License
1985-12-02 Surface Casing Operation Performed
1985-12-04 Finished Drilling
1985-12-05 Well Log Performed
1985-12-06 Production Casing Operation Performed
1985-12-06 Rig Released
1985-12-06 Well Mode changed to Drilled and Cased
1986-01-24 Well Log Performed
1986-01-25 Well Log Performed
1986-01-29 Perforation Treatment Performed - Jet Perforation
1989-10-02 Well Began Production
1989-10-02 Well Fluid changed to Gas
1989-10-02 Well Mode changed to Flowing
2003-12-07 Well Log Performed
2003-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-08 Perforation Treatment Performed - Jet Perforation
2003-12-08 Plug Back Performed
2003-12-08 Well Fluid changed to Gas
2003-12-08 Well Mode changed to Abandoned Zone
2003-12-10 Perforation Treatment Performed - Fractured
2005-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-28 Plug Back Performed
2005-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-02 Perforation Treatment Performed - Jet Perforation
2005-03-02 Perforation Treatment Performed - Remedial Casing
2005-03-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-29 Perforation 528.00 529.00 13
1986-01-29 Perforation 532.50 533.50 13
2003-12-08 Packing Device Capped w/Cement 505.50 513.50 0
2003-12-08 Perforation 493.00 494.00 17
2003-12-10 Fracture 493.00 494.00 0
2005-02-28 Packing Device Capped w/Cement 475.00 483.00 0
2005-03-02 Perforation 313.50 314.00 13
2005-03-02 Remedial Casing Cementing 313.50 314.00 0
2005-03-02 Packing Device Capped w/Cement 290.00 309.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1019 0.0 0.0 0.0
1990 4792 0.0 0.0 0.0
1991 4696 0.0 0.0 0.0
1992 2718 0.0 0.0 0.0
1993 8513 0.0 0.0 0.0
1994 8568 0.0 0.0 0.0
1995 8450 0.0 0.0 0.0
1996 8556 0.0 0.0 0.0
1997 8674 0.0 0.0 0.0
1998 7732 0.0 0.0 0.0
1999 7851 0.0 0.0 0.0
2000 3669 0.0 0.0 0.0
2001 1184 0.0 0.0 0.0

For data sources see[5]

References