X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505132401000

Well Details

Well ID: 0505132401000
Loading map...
Location: 00/01-24-050-13W5/0
Location Alias: 00/01-24-50-13 W5M
Location Alias 2: 00/01-24-050-13 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 13
Section: 24
County/Municipality: Yellowhead County
Well Name: VERMILION HZ PEMBINA 1-24-50-13
Operator Name: Vermilion Energy Inc.
License Number: 0435306
License Date: 2011-07-20
License Status: Amended
Spud Date: 2011-12-05
Final Drill Date: 2011-12-13
Well Total Depth: 3575.00 m
Surface Hole Latitude: 53.340859
Surface Hole Longitude: -115.762319

For data sources see[1][2]

Well History

Date Event
2011-07-20 Obtained License
2011-12-06 Surface Casing Operation Performed
2011-12-07 Well Log Performed
2011-12-08 Direction Drilling Operation Performed - Horizontal
2011-12-13 Finished Drilling
2011-12-13 Well Mode changed to Drilled and Cased
2011-12-15 Production Casing Operation Performed
2011-12-16 Rig Released
2012-01-16 Well Log Performed
2012-01-19 Perforation Treatment Performed - Open-Hole Completion
2012-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-18 Well Began Production
2012-02-18 Well Fluid changed to Crude Oil
2012-02-18 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-08 1504.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-19 Open Hole/Barefoot Completion 3571.00 3575.00 0
2012-01-22 Multi-Stage Fracture 2920.70 2920.80 0
2012-01-22 Multi-Stage Fracture 2846.70 2846.80 0
2012-01-22 Multi-Stage Fracture 2758.70 2758.80 0
2012-01-22 Multi-Stage Fracture 2685.30 2685.40 0
2012-01-22 Multi-Stage Fracture 2597.40 2597.50 0
2012-01-22 Multi-Stage Fracture 2523.10 2523.20 0
2012-01-22 Multi-Stage Fracture 2435.20 2435.30 0
2012-01-22 Multi-Stage Fracture 2361.20 2361.30 0
2012-01-23 Multi-Stage Fracture 2273.20 2273.30 0
2012-01-25 Multi-Stage Fracture 2212.90 2213.00 0
2012-01-21 Multi-Stage Fracture 3545.70 3545.80 0
2012-01-21 Multi-Stage Fracture 3478.60 3478.70 0
2012-01-21 Multi-Stage Fracture 3404.80 3404.90 0
2012-01-21 Multi-Stage Fracture 3317.30 3317.40 0
2012-01-21 Multi-Stage Fracture 3243.60 3243.70 0
2012-01-21 Multi-Stage Fracture 3155.90 3156.00 0
2012-01-22 Multi-Stage Fracture 3082.00 3082.10 0
2012-01-22 Multi-Stage Fracture 2994.30 2994.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6396 0.0 0.0 0.0
2013 8638 0.0 0.0 0.0
2014 7681 0.0 0.0 0.0
2015 8451 0.0 0.0 0.0
2016 8633 0.0 0.0 0.0
2017 8577 0.0 0.0 0.0
2018 8222 0.0 0.0 0.0
2019 8172 0.0 0.0 0.0
2020 1989 0.0 0.0 0.0

For data sources see[6]

References