If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505123213020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.362618,"lon":-115.699542,"icon":""}]} |
Location: 02/13-32-050-12W5/0 | |
Location Alias: 02/13-32-50-12 W5M | |
Location Alias 2: 02/13-32-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 32 | |
County/Municipality: Yellowhead County | |
Well Name: BONTERRA 102 HZ PEMBINA 13-32-50-12 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0479355 | |
License Date: 2016-04-27 | |
License Status: Issued | |
Spud Date: 2016-05-16 | |
Final Drill Date: 2016-05-25 | |
Well Total Depth: 3445.00 m | |
Surface Hole Latitude: 53.362618 | |
Surface Hole Longitude: -115.699542 |
Date | Event |
---|---|
2016-04-27 | Obtained License |
2016-05-17 | Surface Casing Operation Performed |
2016-05-18 | Direction Drilling Operation Performed - Deviate |
2016-05-20 | Direction Drilling Operation Performed - Horizontal |
2016-05-25 | Finished Drilling |
2016-05-25 | Production Casing Operation Performed |
2016-05-25 | Well Log Performed |
2016-05-25 | Well Mode changed to Drilled and Cased |
2016-05-26 | Rig Released |
2016-06-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-06-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-06-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-06-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-06-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-06-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-07-01 | Well Began Production |
2016-07-01 | Well Fluid changed to Crude Oil |
2016-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-05-16 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-05-18 | 692.20 | Deviate (5 - 79 degrees) |
2016-05-20 | 2005.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-06-14 | Multi-Stage Fracture | 3293.40 | 3294.20 | 0 |
2016-06-21 | Multi-Stage Fracture | 2815.10 | 2815.40 | 0 |
2016-06-21 | Multi-Stage Fracture | 2801.40 | 2801.70 | 0 |
2016-06-21 | Multi-Stage Fracture | 2750.80 | 2751.10 | 0 |
2016-06-21 | Multi-Stage Fracture | 2699.40 | 2699.70 | 0 |
2016-06-21 | Multi-Stage Fracture | 2647.80 | 2648.10 | 0 |
2016-06-21 | Multi-Stage Fracture | 2583.50 | 2583.80 | 0 |
2016-06-22 | Multi-Stage Fracture | 2533.00 | 2533.30 | 0 |
2016-06-22 | Multi-Stage Fracture | 2483.00 | 2483.30 | 0 |
2016-06-22 | Multi-Stage Fracture | 2419.00 | 2419.30 | 0 |
2016-06-22 | Multi-Stage Fracture | 2367.60 | 2367.90 | 0 |
2016-06-16 | Multi-Stage Fracture | 3242.40 | 3243.30 | 0 |
2016-06-22 | Multi-Stage Fracture | 2316.00 | 2316.30 | 0 |
2016-06-22 | Multi-Stage Fracture | 2252.70 | 2253.00 | 0 |
2016-06-22 | Multi-Stage Fracture | 2202.10 | 2202.40 | 0 |
2016-06-22 | Multi-Stage Fracture | 2151.40 | 2151.70 | 0 |
2016-06-22 | Multi-Stage Fracture | 2087.60 | 2087.90 | 0 |
2016-06-22 | Multi-Stage Fracture | 2036.20 | 2036.50 | 0 |
2016-06-17 | Multi-Stage Fracture | 3191.00 | 3191.90 | 0 |
2016-06-18 | Multi-Stage Fracture | 3140.90 | 3141.80 | 0 |
2016-06-18 | Multi-Stage Fracture | 3089.80 | 3090.70 | 0 |
2016-06-18 | Multi-Stage Fracture | 3032.10 | 3032.40 | 0 |
2016-06-21 | Multi-Stage Fracture | 2981.00 | 2981.30 | 0 |
2016-06-21 | Multi-Stage Fracture | 2917.40 | 2917.70 | 0 |
2016-06-21 | Multi-Stage Fracture | 2866.60 | 2866.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-06-14 | 2016-06-22 | 1,773 | 2,772 | N/A |
2 | 2016-06-18 | 2016-06-22 | 1,773 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 91.1381 | N/A | |||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 7.6105 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0113 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0113 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0113 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0113 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0113 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1704 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1704 | N/A | ||||
GFR-1 | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.1148 | N/A | |
S-17 | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.0492 | N/A | |
water | Not Available | 100 | 0.0492 | N/A | ||||
2 | Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 1.5123 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-06-18 | 2016-06-22 | Surface Water - River | 2278 |
2016-06-16 | 2016-06-18 | Recycled Fracturing Water (treated at well site) | 494 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 4134 | 0.0 | 0.0 | 0.0 |
2017 | 8606 | 0.0 | 0.0 | 0.0 |
2018 | 8584 | 0.0 | 0.0 | 0.0 |
2019 | 7597 | 0.0 | 0.0 | 0.0 |
2020 | 2117 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-05-26 | No Incident Encountered | 0.00 | 0.00 |
2016-06-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]