If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505122716020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.348965,"lon":-115.688322,"icon":""}]} |
Location: 02/16-27-050-12W5/0 | |
Location Alias: 02/16-27-50-12 W5M | |
Location Alias 2: 02/16-27-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 27 | |
County/Municipality: Yellowhead County | |
Well Name: BONTERRA 102 HZ PEMBINA 16-27-50-12 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0457447 | |
License Date: 2013-06-10 | |
License Status: Issued | |
Spud Date: 2013-07-12 | |
Final Drill Date: 2013-07-22 | |
Well Total Depth: 3397.00 m | |
Surface Hole Latitude: 53.348965 | |
Surface Hole Longitude: -115.688322 |
Date | Event |
---|---|
2013-06-10 | Obtained License |
2013-07-13 | Surface Casing Operation Performed |
2013-07-15 | Direction Drilling Operation Performed - Deviate |
2013-07-17 | Direction Drilling Operation Performed - Horizontal |
2013-07-22 | Finished Drilling |
2013-07-22 | Well Mode changed to Drilled and Cased |
2013-07-23 | Production Casing Operation Performed |
2013-07-23 | Rig Released |
2013-07-26 | Well Log Performed |
2013-08-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-07 | Well Began Production |
2013-08-07 | Well Fluid changed to Crude Oil |
2013-08-07 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-07-12 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-07-15 | 1371.90 | Deviate (5 - 79 degrees) |
2013-07-17 | 1950.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-08-01 | Multi-Stage Fracture | 3364.40 | 3364.50 | 0 |
2013-08-01 | Multi-Stage Fracture | 2684.50 | 2684.60 | 0 |
2013-08-01 | Multi-Stage Fracture | 2612.10 | 2612.20 | 0 |
2013-08-01 | Multi-Stage Fracture | 2539.60 | 2539.70 | 0 |
2013-08-01 | Multi-Stage Fracture | 2467.10 | 2467.20 | 0 |
2013-08-01 | Multi-Stage Fracture | 2394.60 | 2394.70 | 0 |
2013-08-01 | Multi-Stage Fracture | 2322.10 | 2322.20 | 0 |
2013-08-01 | Multi-Stage Fracture | 2249.70 | 2249.80 | 0 |
2013-08-01 | Multi-Stage Fracture | 2177.20 | 2177.30 | 0 |
2013-08-01 | Multi-Stage Fracture | 2104.50 | 2104.60 | 0 |
2013-08-01 | Multi-Stage Fracture | 3277.50 | 3277.60 | 0 |
2013-08-01 | Multi-Stage Fracture | 3191.50 | 3191.60 | 0 |
2013-08-01 | Multi-Stage Fracture | 3119.10 | 3119.20 | 0 |
2013-08-01 | Multi-Stage Fracture | 3046.70 | 3046.80 | 0 |
2013-08-01 | Multi-Stage Fracture | 2974.20 | 2974.30 | 0 |
2013-08-01 | Multi-Stage Fracture | 2901.70 | 2901.80 | 0 |
2013-08-01 | Multi-Stage Fracture | 2829.50 | 2829.60 | 0 |
2013-08-01 | Multi-Stage Fracture | 2757.00 | 2757.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-08-01 | 2013-08-01 | 1,762 | 3,163 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 88.8413 | N/A | |||
Sand (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 6.6241 | N/A | ||
Sand (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 3.6985 | N/A | ||
Sand (50/140) | Trican | silica crystalline | 14808-60-7 | 100 | 0.4087 | N/A | ||
PROBIO-100 | Trican | Bactericide/Biocide | non-hazardous ingredients | Not Available | 100 | 0.0204 | N/A | |
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.2284 | N/A | |
water | 7732-18-5 | 100 | 0.2284 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0497 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0497 | N/A | ||||
GFR-1 | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.1284 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-07-29 | 2013-08-31 | Surface Water - Runoff | 3000 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 3303 | 0.0 | 0.0 | 0.0 |
2014 | 8384 | 0.0 | 0.0 | 0.0 |
2015 | 8266 | 0.0 | 0.0 | 0.0 |
2016 | 8538 | 0.0 | 0.0 | 0.0 |
2017 | 8627 | 0.0 | 0.0 | 0.0 |
2018 | 8623 | 0.0 | 0.0 | 0.0 |
2019 | 7977 | 0.0 | 0.0 | 0.0 |
2020 | 2117 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-07-23 | No Incident Encountered | 0.00 | 0.00 |
2013-08-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]